Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,176
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0543 # 08 Y:2015 | 08 | 2015 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $192 | $500 | Implemented |
NC0543 # 09 Y:2015 | 09 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $311 | $80 | Implemented |
NC0543 # 10 Y:2015 | 10 | 2015 | TURN OFF EQUIPMENT WHEN NOT IN USE | $8,618 | $20,000 | Not Implemented |
NC0543 # 11 Y:2015 | 11 | 2015 | DEVELOP A REPAIR/REPLACE POLICY | $2,491 | $4,256 | Not Implemented |
NC0543 # 12 Y:2015 | 12 | 2015 | USE EVAPORATION TO CONCENTRATE MATERIAL | $4,794 | $19,000 | Not Implemented |
NC0542 # 01 Y:2015 | 01 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $21,174 | $20,250 | Implemented |
NC0542 # 02 Y:2015 | 02 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,264 | $200 | Implemented |
NC0542 # 03 Y:2015 | 03 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,263 | $3,000 | Implemented |
NC0542 # 04 Y:2015 | 04 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $209 | $230 | Implemented |
NC0542 # 05 Y:2015 | 05 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,525 | $3,000 | Implemented |
NC0542 # 06 Y:2015 | 06 | 2015 | ISOLATE HOT OR COLD EQUIPMENT | $5,296 | $420 | Implemented |
NC0542 # 07 Y:2015 | 07 | 2015 | REDESIGN PROCESS | $2,648 | $500 | Not Implemented |
NC0542 # 08 Y:2015 | 08 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,576 | $510 | Implemented |
NC0542 # 09 Y:2015 | 09 | 2015 | DEVELOP A REPAIR/REPLACE POLICY | $3,364 | $5,865 | Implemented |
NC0542 # 10 Y:2015 | 10 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $741 | $140 | Implemented |
NC0542 # 11 Y:2015 | 11 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $580 | $144 | Implemented |
NC0542 # 12 Y:2015 | 12 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,925 | $8,373 | Implemented |
NC0542 # 13 Y:2015 | 13 | 2015 | INSTALL OCCUPANCY SENSORS | $1,213 | $500 | Implemented |
NC0541 # 01 Y:2015 | 01 | 2015 | DEVELOP STANDARD OPERATING PROCEDURES | $27,300 | $10,000 | Not Implemented |
NC0541 # 02 Y:2015 | 02 | 2015 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,334 | $1,131 | Not Implemented |
NC0541 # 03 Y:2015 | 03 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $596 | $160 | Implemented |
NC0541 # 04 Y:2015 | 04 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $299 | $405 | Not Implemented |
NC0541 # 05 Y:2015 | 05 | 2015 | INSTALL OCCUPANCY SENSORS | $536 | $918 | Not Implemented |
NC0541 # 06 Y:2015 | 06 | 2015 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $1,054 | $5,000 | Not Implemented |
NC0541 # 07 Y:2015 | 07 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $634 | $3,000 | Not Implemented |