IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

257

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0092 # 03 Y:1996 03 1996 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $27,124 $60,000 Implemented
NC0092 # 04 Y:1996 04 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $30,449 $20,428 Implemented
NC0092 # 05 Y:1996 05 1996 DISCONNECT BALLASTS $1,300 $1,430 Implemented
NC0092 # 06 Y:1996 06 1996 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $5,891 $50 Implemented
NC0092 # 07 Y:1996 07 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $32,148 $1,904 Implemented
NC0092 # 08 Y:1996 08 1996 USE OPTIMUM THICKNESS INSULATION $164 $240 Implemented
NC0092 # 09 Y:1996 09 1996 USE DIRECT FLAME IMPINGEMENT OR INFRARED PROCESSING FOR CHAMBER TYPE HEATING $100,360 $600,000 Not Implemented
NC0092 # 10 Y:1996 10 1996 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $26,400 $10,000 Implemented
NC0092 # 11 Y:1996 11 1996 USE LESS WASTEFUL PACKAGING $5,100 $0 Implemented
NC0091 # 01 Y:1996 01 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $68,531 $132,000 Not Implemented
NC0091 # 02 Y:1996 02 1996 INSULATE BARE EQUIPMENT $946 $1,155 Implemented
NC0091 # 03 Y:1996 03 1996 USE OPTIMUM THICKNESS INSULATION $368 $195 Not Implemented
NC0091 # 04 Y:1996 04 1996 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $3,668 $6,000 Implemented
NC0091 # 05 Y:1996 05 1996 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $18,922 $56,200 Not Implemented
NC0091 # 06 Y:1996 06 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,524 $28,500 Not Implemented
NC0091 # 07 Y:1996 07 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $802 $420 Not Implemented
NC0091 # 08 Y:1996 08 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $884 $600 Implemented
NC0091 # 09 Y:1996 09 1996 INSTALL OCCUPANCY SENSORS $1,412 $500 Not Implemented
NC0091 # 10 Y:1996 10 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $199 $168 Not Implemented
NC0091 # 11 Y:1996 11 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $246 $980 Implemented
NC0091 # 12 Y:1996 12 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $909 $761 Implemented
NC0091 # 13 Y:1996 13 1996 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $56 $100 Implemented
NC0094 # 01 Y:1996 01 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,416 $960 Implemented
NC0094 # 02 Y:1996 02 1996 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $724 $400 Not Implemented
NC0094 # 03 Y:1996 03 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,343 $22,000 Not Implemented