IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

384

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0417 # 02 Y:2010 02 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,199 $100 Implemented
NC0417 # 03 Y:2010 03 2010 RECOVER WASTE HEAT FROM EQUIPMENT $7,220 $2,500 Not Implemented
NC0417 # 04 Y:2010 04 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $739 $180 Not Implemented
NC0417 # 05 Y:2010 05 2010 ADOPT IN-HOUSE MATERIAL GENERATION $26,671 $70,000 Not Implemented
NC0417 # 06 Y:2010 06 2010 REPAIR OR REPLACE STEAM TRAPS $2,928 $1,000 Not Implemented
NC0417 # 07 Y:2010 07 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $168 $199 Not Implemented
NC0417 # 08 Y:2010 08 2010 INSTALL OCCUPANCY SENSORS $2,865 $2,751 Not Implemented
NC0417 # 09 Y:2010 09 2010 USE PHOTOCELL CONTROLS $417 $122 Not Implemented
NC0406 # 01 Y:2010 01 2010 ADOPT IN-HOUSE MATERIAL GENERATION $77,083 $85,000 Not Implemented
NC0406 # 02 Y:2010 02 2010 TREAT AND REUSE RINSE WATERS $51,487 $8,875 Not Implemented
NC0406 # 03 Y:2010 03 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $11,177 $50 Implemented
NC0406 # 04 Y:2010 04 2010 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $16,743 $50,000 Implemented
NC0406 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,835 $100 Implemented
NC0406 # 06 Y:2010 06 2010 RECOVER WASTE HEAT FROM EQUIPMENT $10,210 $15,045 Not Implemented
NC0406 # 07 Y:2010 07 2010 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $4,747 $8,000 Not Implemented
NC0406 # 08 Y:2010 08 2010 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $508 $920 Implemented
NC0406 # 09 Y:2010 09 2010 INSTALL OCCUPANCY SENSORS $1,958 $3,256 Implemented
NC0406 # 10 Y:2010 10 2010 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $276,388 $214,700 Implemented
NC0406 # 11 Y:2010 11 2010 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $20,625 $50,000 Implemented
NC0372 # 01 Y:2008 01 2008 OPTIMIZE PLANT POWER FACTOR $10,092 $8,000 Not Implemented
NC0372 # 02 Y:2008 02 2008 COMBINE UTILITY METERS $61,386 $25,000 Not Implemented
NC0372 # 03 Y:2008 03 2008 ADJUST BURNERS FOR EFFICIENT OPERATION $1,636 $1,600 Not Implemented
NC0372 # 04 Y:2008 04 2008 RECOVER WASTE HEAT FROM EQUIPMENT $255,208 $500,000 Not Implemented
NC0372 # 05 Y:2008 05 2008 INSULATE BARE EQUIPMENT $721 $250 Not Implemented
NC0372 # 06 Y:2008 06 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,090 $50 Not Implemented