IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,176

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0388 # 07 Y:2009 07 2009 DEVELOP A REPAIR/REPLACE POLICY $5,653 $8,935 Implemented
NC0387 # 01 Y:2009 01 2009 USE DEMAND CONTROLLER OR LOAD SHEDDER $202,240 $400,000 Not Implemented
NC0387 # 02 Y:2009 02 2009 MAKE ICE DURING OFF PEAK HOURS FOR COOLING $51,343 $72,000 Not Implemented
NC0387 # 03 Y:2009 03 2009 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $44,613 $45,000 Not Implemented
NC0387 # 04 Y:2009 04 2009 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $21,000 $25,000 Not Implemented
NC0387 # 05 Y:2009 05 2009 RECOVER WASTE HEAT FROM EQUIPMENT $8,105 $7,000 Not Implemented
NC0387 # 06 Y:2009 06 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,447 $100 Implemented
NC0387 # 07 Y:2009 07 2009 DEVELOP A REPAIR/REPLACE POLICY $2,019 $2,198 Not Implemented
NC0387 # 08 Y:2009 08 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $44,156 $85,555 Implemented
NC0387 # 09 Y:2009 09 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $712 $351 Not Implemented
NC0386 # 01 Y:2009 01 2009 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $31,742 $49,000 Not Implemented
NC0386 # 02 Y:2009 02 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,160 $0 Not Implemented
NC0386 # 03 Y:2009 03 2009 RECOVER WASTE HEAT FROM EQUIPMENT $9,621 $3,300 Not Implemented
NC0386 # 04 Y:2009 04 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,236 $100 Not Implemented
NC0386 # 05 Y:2009 05 2009 DEVELOP A REPAIR/REPLACE POLICY $2,916 $2,848 Not Implemented
NC0386 # 06 Y:2009 06 2009 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,520 $0 Not Implemented
NC0386 # 07 Y:2009 07 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,493 $6,490 Not Implemented
NC0386 # 08 Y:2009 08 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,405 $32,776 Not Implemented
NC0386 # 09 Y:2009 09 2009 INSTALL OCCUPANCY SENSORS $6,974 $8,400 Not Implemented
NC0385 # 01 Y:2009 01 2009 COMBINE UTILITY METERS $2,054 $0 Not Implemented
NC0385 # 02 Y:2009 02 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,357 $500 Implemented
NC0385 # 03 Y:2009 03 2009 RECOVER WASTE HEAT FROM EQUIPMENT $1,705 $1,900 Not Implemented
NC0385 # 04 Y:2009 04 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $210 $0 Implemented
NC0385 # 05 Y:2009 05 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,555 $9,880 Implemented
NC0385 # 06 Y:2009 06 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $872 $1,643 Implemented