Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
384
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0654 # 05 Y:2020 | 05 | 2020 | RECOVER WASTE HEAT FROM EQUIPMENT | $44,735 | $130,000 | Not Implemented |
NC0654 # 04 Y:2020 | 04 | 2020 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $1,543 | $6,700 | Not Implemented |
NC0654 # 03 Y:2020 | 03 | 2020 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $11,303 | $20,000 | Not Implemented |
NC0654 # 02 Y:2020 | 02 | 2020 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $15,030 | $75,000 | Not Implemented |
NC0654 # 01 Y:2020 | 01 | 2020 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $1,381,024 | $8,000,000 | Not Implemented |
NC0582 # 06 Y:2017 | 06 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,983 | $200 | Implemented |
NC0582 # 01 Y:2017 | 01 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $97,269 | $199,760 | Implemented |
NC0582 # 02 Y:2017 | 02 | 2017 | DISCONNECT BALLASTS | $6,320 | $550 | Not Implemented |
NC0582 # 03 Y:2017 | 03 | 2017 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $38,581 | $20,000 | Implemented |
NC0582 # 04 Y:2017 | 04 | 2017 | INSTALL OCCUPANCY SENSORS | $8,560 | $17,350 | Implemented |
NC0582 # 05 Y:2017 | 05 | 2017 | USE PHOTOCELL CONTROLS | $1,021 | $500 | Implemented |
NC0582 # 07 Y:2017 | 07 | 2017 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $11,603 | $500 | Implemented |
NC0582 # 08 Y:2017 | 08 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,895 | $100 | Not Implemented |
NC0582 # 09 Y:2017 | 09 | 2017 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,470 | $4,500 | Not Implemented |
NC0582 # 10 Y:2017 | 10 | 2017 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $11,578 | $500 | Implemented |
NC0582 # 11 Y:2017 | 11 | 2017 | DEVELOP A REPAIR/REPLACE POLICY | $1,782 | $5,865 | Implemented |
NC0582 # 12 Y:2017 | 12 | 2017 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $7,886 | $4,100 | Not Implemented |
NC0568 # 06 Y:2016 | 06 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,342 | $100 | Not Implemented |
NC0568 # 01 Y:2016 | 01 | 2016 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $306,868 | $500 | Not Implemented |
NC0568 # 02 Y:2016 | 02 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $179,170 | $887,700 | Implemented |
NC0568 # 03 Y:2016 | 03 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,495 | $22,028 | Not Implemented |
NC0568 # 04 Y:2016 | 04 | 2016 | INSTALL OCCUPANCY SENSORS | $2,121 | $3,123 | Not Implemented |
NC0568 # 05 Y:2016 | 05 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,081 | $200 | Implemented |
NC0568 # 07 Y:2016 | 07 | 2016 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $10,217 | $33,300 | Not Implemented |
NC0568 # 10 Y:2016 | 10 | 2016 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $25,240 | $100,000 | Not Implemented |