Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
40
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0383 # 08 Y:2008 | 08 | 2008 | RECOVER WASTE HEAT FROM EQUIPMENT | $11,043 | $6,150 | Not Implemented |
NC0383 # 12 Y:2008 | 12 | 2008 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $850 | $750 | Not Implemented |
NC0383 # 11 Y:2008 | 11 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,695 | $1,497 | Implemented |
NC0383 # 10 Y:2008 | 10 | 2008 | DEVELOP A REPAIR/REPLACE POLICY | $11,700 | $11,589 | Implemented |
NC0383 # 02 Y:2008 | 02 | 2008 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $38,474 | $0 | Implemented |
NC0383 # 04 Y:2008 | 04 | 2008 | INCREASE AMOUNT OF CONDENSATE RETURNED | $19,037 | $30,000 | Not Implemented |
NC0383 # 06 Y:2008 | 06 | 2008 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $4,245 | $20,000 | Not Implemented |
NC0383 # 01 Y:2008 | 01 | 2008 | ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | $16,582 | $1,000 | Implemented |
NC0383 # 07 Y:2008 | 07 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,848 | $50 | Not Implemented |
NC0383 # 09 Y:2008 | 09 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,623 | $100 | Implemented |
NC0383 # 03 Y:2008 | 03 | 2008 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $42,558 | $50,000 | Implemented |
NC0383 # 05 Y:2008 | 05 | 2008 | INSTALL DE-AERATOR IN PLACE OF CONDENSATE TANK | $4,551 | $10,000 | Implemented |
NC0381 # 06 Y:2008 | 06 | 2008 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,183 | $4,900 | Not Implemented |
NC0381 # 05 Y:2008 | 05 | 2008 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $998 | $500 | Implemented |
NC0381 # 04 Y:2008 | 04 | 2008 | INSULATE BARE EQUIPMENT | $1,224 | $1,030 | Implemented |
NC0381 # 03 Y:2008 | 03 | 2008 | ADJUST BURNERS FOR EFFICIENT OPERATION | $1,430 | $800 | Implemented |
NC0381 # 02 Y:2008 | 02 | 2008 | REPLACE BOILER | $34,528 | $60,000 | Not Implemented |
NC0381 # 07 Y:2008 | 07 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,016 | $100 | Implemented |
NC0381 # 01 Y:2008 | 01 | 2008 | RECOVER WASTE HEAT FROM EQUIPMENT | $80,420 | $183,000 | Not Implemented |
NC0381 # 08 Y:2008 | 08 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,562 | $1,472 | Not Implemented |
NC0381 # 09 Y:2008 | 09 | 2008 | DEVELOP A REPAIR/REPLACE POLICY | $1,192 | $1,540 | Not Implemented |
NC0379 # 08 Y:2008 | 08 | 2008 | DEVELOP A REPAIR/REPLACE POLICY | $834 | $1,728 | Implemented |
NC0379 # 04 Y:2008 | 04 | 2008 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $2,284 | $3,000 | Implemented |
NC0379 # 03 Y:2008 | 03 | 2008 | REDUCE VENTILATION AIR | $7,706 | $25,500 | Not Implemented |
NC0379 # 02 Y:2008 | 02 | 2008 | LOWER OPERATING PRESSURE OF CONDENSER (STEAM) | $333 | $100 | Implemented |