Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
180
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0208 # 02 Y:2001 | 02 | 2001 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $45,000 | $21,500 | Not Implemented |
NC0208 # 01 Y:2001 | 01 | 2001 | USE OPTIMUM THICKNESS INSULATION | $2,937 | $4,950 | Not Implemented |
NC0208 # 03 Y:2001 | 03 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $151 | $2,700 | Implemented |
NC0208 # 04 Y:2001 | 04 | 2001 | USE PHOTOCELL CONTROLS | $113 | $200 | Implemented |
NC0208 # 05 Y:2001 | 05 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $792 | $100 | Implemented |
NC0208 # 06 Y:2001 | 06 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $158 | $200 | Not Implemented |
NC0208 # 07 Y:2001 | 07 | 2001 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $22,836 | $6,500 | Implemented |
NC0226 # 03 Y:2001 | 03 | 2001 | INSULATE BARE EQUIPMENT | $2,071 | $407 | Not Implemented |
NC0226 # 06 Y:2001 | 06 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $279 | $150 | Not Implemented |
NC0226 # 07 Y:2001 | 07 | 2001 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $23,668 | $26,000 | Not Implemented |
NC0226 # 01 Y:2001 | 01 | 2001 | DEVELOP A REPAIR/REPLACE POLICY | $10,828 | $12,834 | Not Implemented |
NC0226 # 08 Y:2001 | 08 | 2001 | REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF | $93,403 | $-312,000 | Not Implemented |
NC0226 # 04 Y:2001 | 04 | 2001 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,800 | $400 | Not Implemented |
NC0226 # 05 Y:2001 | 05 | 2001 | INSULATE BARE EQUIPMENT | $1,122 | $2,225 | Not Implemented |
NC0226 # 02 Y:2001 | 02 | 2001 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $3,348 | $500 | Not Implemented |
NC0227 # 15 Y:2001 | 15 | 2001 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $23,716 | $15,000 | Not Implemented |
NC0227 # 02 Y:2001 | 02 | 2001 | TURN OFF EQUIPMENT WHEN NOT IN USE | $15,815 | $30,000 | Not Implemented |
NC0227 # 03 Y:2001 | 03 | 2001 | INSTALL / REPAIR INSULATION ON STEAM LINES | $662 | $308 | Not Implemented |
NC0227 # 10 Y:2001 | 10 | 2001 | DEVELOP A REPAIR/REPLACE POLICY | $2,636 | $4,205 | Implemented |
NC0227 # 08 Y:2001 | 08 | 2001 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $4,500 | $5,000 | Not Implemented |
NC0227 # 07 Y:2001 | 07 | 2001 | CONTROL PRESSURE ON STEAMER OPERATIONS | $7,356 | $7,500 | Implemented |
NC0227 # 04 Y:2001 | 04 | 2001 | IMPROVE COMBUSTION CONTROL CAPABILITY | $89,586 | $60,000 | Not Implemented |
NC0227 # 05 Y:2001 | 05 | 2001 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $30,612 | $50,000 | Not Implemented |
NC0227 # 09 Y:2001 | 09 | 2001 | ADJUST BURNERS FOR EFFICIENT OPERATION | $17,577 | $15,000 | Not Implemented |
NC0227 # 01 Y:2001 | 01 | 2001 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,391 | $250 | Not Implemented |