Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

244

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ND0363 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,021 $8,040 Implemented
ND0363 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,260 $520 Implemented
ND0363 # 05 Y:2000 05 2000 PAY UTILITY BILLS ON TIME $1,211 $0 Implemented
ND0362 # 05 Y:2000 05 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $491 $40 Implemented
ND0362 # 01 Y:2000 01 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $17,460 $200 Implemented
ND0362 # 07 Y:2000 07 2000 $1,034 $0 Implemented
ND0360 # 05 Y:2000 05 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,566 $560 Implemented
ND0360 # 07 Y:2000 07 2000 USE OPTIMUM TEMPERATURE $86 $20 Implemented
ND0356 # 09 Y:2000 09 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $658 $200 Implemented
ND0356 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $885 $220 Implemented
ND0356 # 01 Y:2000 01 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,224 $853 Implemented
ND0356 # 04 Y:2000 04 2000 TURN OFF EQUIPMENT WHEN NOT IN USE $309 $40 Implemented
ND0356 # 03 Y:2000 03 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $419 $400 Implemented
ND0355 # 04 Y:2000 04 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,566 $300 Implemented
ND0355 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,537 $345 Implemented
ND0355 # 05 Y:2000 05 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,602 $15,700 Implemented
ND0350 # 03 Y:2000 03 2000 REDUCE VENTILATION AIR $15,439 $1,000 Implemented
ND0350 # 06 Y:2000 06 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,226 $24,870 Implemented
ND0350 # 04 Y:2000 04 2000 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,036 $20 Implemented
ND0350 # 07 Y:2000 07 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,647 $0 Implemented
ND0350 # 08 Y:2000 08 2000 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,572 $200 Implemented
ND0346 # 14 Y:2000 14 2000 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $64 $10 Implemented
ND0346 # 09 Y:2000 09 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,454 $750 Implemented
ND0346 # 05 Y:2000 05 2000 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $12,004 $50 Implemented
ND0346 # 04 Y:2000 04 2000 CHECK FOR ACCURACY OF UTILITY / POWER METERS $25,612 $500 Implemented