Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
300
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NL0078 # 07 Y:2023 | 07 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $270 | $415 | Implemented |
NL0078 # 06 Y:2023 | 06 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $658 | $80 | Implemented |
NL0078 # 05 Y:2023 | 05 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $812 | $2,080 | Implemented |
NL0078 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,587 | $2,300 | Implemented |
NL0078 # 02 Y:2023 | 02 | 2023 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $10,358 | $17,280 | Implemented |
NL0078 # 01 Y:2023 | 01 | 2023 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $31,345 | $100,000 | Implemented |
NL0077 # 06 Y:2023 | 06 | 2023 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $527 | $200 | Implemented |
NL0077 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,279 | $4,500 | Implemented |
NL0077 # 02 Y:2023 | 02 | 2023 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $121,895 | $4,200 | Implemented |
NL0076 # 06 Y:2022 | 06 | 2022 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $4,338 | $7,210 | Implemented |
NL0076 # 05 Y:2022 | 05 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $6,194 | $140 | Implemented |
NL0076 # 03 Y:2022 | 03 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,256 | $4,500 | Implemented |
NL0075 # 04 Y:2022 | 04 | 2022 | INSULATE BARE EQUIPMENT | $980 | $404 | Implemented |
NL0075 # 03 Y:2022 | 03 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,087 | $1,652 | Implemented |
NL0075 # 01 Y:2022 | 01 | 2022 | AIR CONDITION ONLY SPACE NECESSARY | $13,412 | $7,500 | Implemented |
NL0073 # 05 Y:2022 | 05 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $772 | $58 | Implemented |
NL0073 # 04 Y:2022 | 04 | 2022 | USE OTHER WASTE CONCENTRATION METHODS | $1,144 | $1,258 | Implemented |
NL0073 # 02 Y:2022 | 02 | 2022 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $7,537 | $35,000 | Implemented |
NL0073 # 01 Y:2022 | 01 | 2022 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $16,217 | $225,000 | Implemented |
NL0072 # 03 Y:2022 | 03 | 2022 | USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) | $2,055 | $266 | Implemented |
NL0072 # 02 Y:2022 | 02 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,761 | $20,400 | Implemented |
NL0072 # 01 Y:2022 | 01 | 2022 | REPLACE BOILER | $18,966 | $23,925 | Implemented |
NL0071 # 03 Y:2022 | 03 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $21,879 | $30,410 | Implemented |
NL0071 # 02 Y:2022 | 02 | 2022 | MINIMIZE WATER USAGE | $106,955 | $72,150 | Implemented |
NL0071 # 05 Y:2022 | 05 | 2022 | INSULATE BARE EQUIPMENT | $2,400 | $9,724 | Implemented |