IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

540

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NL0062 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,413 $660 Implemented
NL0062 # 05 Y:2022 05 2022 RECOVER AND REUSE WASTE MATERIAL $1,313 $440 Not Implemented
NL0062 # 06 Y:2022 06 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,261 $918 Not Implemented
NL0062 # 07 Y:2022 07 2022 AIR CONDITION ONLY SPACE NECESSARY $424 $50,000 Implemented
NL0061 # 01 Y:2022 01 2022 METER WASTE WATER $9,914 $580 Not Implemented
NL0061 # 02 Y:2022 02 2022 USE POWER DURING OFF-PEAK PERIODS $9,080 $70 Implemented
NL0061 # 03 Y:2022 03 2022 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $4,939 $70 Implemented
NL0061 # 04 Y:2022 04 2022 METER WASTE WATER $3,714 $580 Not Implemented
NL0061 # 05 Y:2022 05 2022 RECOVER AND REUSE WASTE MATERIAL $3,432 $3,500 Implemented
NL0061 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,556 $2,500 Implemented
NL0061 # 07 Y:2022 07 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $967 $1,650 Not Implemented
NL0061 # 08 Y:2022 08 2022 INSTALL OCCUPANCY SENSORS $595 $1,289 Implemented
NL0060 # 01 Y:2021 01 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,780 $6,000 Implemented
NL0060 # 02 Y:2021 02 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,978 $8,057 Implemented
NL0060 # 03 Y:2021 03 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $908 $1,790 Implemented
NL0059 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,547 $51,468 Implemented
NL0059 # 02 Y:2021 02 2021 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $8,198 $50,347 Not Implemented
NL0059 # 03 Y:2021 03 2021 INSTALL OCCUPANCY SENSORS $702 $4,153 Not Implemented
NL0059 # 04 Y:2021 04 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $479 $500 Implemented
NL0059 # 05 Y:2021 05 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $318 $1,350 Not Implemented
NL0059 # 06 Y:2021 06 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $139 $220 Not Implemented
NL0058 # 01 Y:2021 01 2021 USE SOLAR HEAT TO MAKE ELECTRICTY $282,217 $1,200,000 Not Implemented
NL0058 # 02 Y:2021 02 2021 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $24,583 $30,000 Not Implemented
NL0058 # 03 Y:2021 03 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,369 $6,060 Implemented
NL0058 # 04 Y:2021 04 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,510 $2,500 Implemented