IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,124

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NV0170 # 04 Y:2000 04 2000 RECOVER AND REUSE WASTE MATERIAL $8,109 $14,542 Implemented
NV0170 # 02 Y:2000 02 2000 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,709 $95 Not Implemented
NV0170 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,657 $360 Implemented
NV0170 # 03 Y:2000 03 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $985 $100 Implemented
NV0169 # 05 Y:2000 05 2000 INSTALL AN UNINTERUPTABLE POWER SUPPLY $164,384 $1,250 Not Implemented
NV0169 # 02 Y:2000 02 2000 INSTALL SKYLIGHTS $13,086 $25,700 Not Implemented
NV0169 # 03 Y:2000 03 2000 INSTALL / REPAIR INSULATION ON STEAM LINES $865 $620 Not Implemented
NV0169 # 04 Y:2000 04 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $308 $661 Implemented
NV0169 # 06 Y:2000 06 2000 ELIMINATE/REDUCE REDUNDANT INSPECTIONS $13,013 $1,000 Not Implemented
NV0169 # 01 Y:2000 01 2000 TURN OFF EQUIPMENT WHEN NOT IN USE $16,388 $5,060 Not Implemented
NV0168 # 05 Y:2000 05 2000 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $6,086 $2,074 n/a
NV0168 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $23,982 $160 n/a
NV0168 # 03 Y:2000 03 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,700 $8,947 n/a
NV0168 # 02 Y:2000 02 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,550 $0 n/a
NV0168 # 04 Y:2000 04 2000 RECOVER AND REUSE WASTE MATERIAL $99,450 $400 n/a
NV0167 # 04 Y:2000 04 2000 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $3,315 $680 Not Implemented
NV0167 # 03 Y:2000 03 2000 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $229 $0 Not Implemented
NV0167 # 02 Y:2000 02 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $414 $50 Implemented
NV0167 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,639 $200 Implemented
NV0166 # 01 Y:2000 01 2000 AIR CONDITION ONLY SPACE NECESSARY $32,352 $17,000 n/a
NV0166 # 04 Y:2000 04 2000 TURN OFF EQUIPMENT WHEN NOT IN USE $81 $0 n/a
NV0166 # 03 Y:2000 03 2000 RECOVER WASTE HEAT FROM EQUIPMENT $180 $194 n/a
NV0166 # 02 Y:2000 02 2000 INSTALL OCCUPANCY SENSORS $321 $255 n/a
NV0166 # 05 Y:2000 05 2000 AUTOMATE FINISHING PROCESS $195,000 $3,465 n/a
NV0164 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $95,346 $200 n/a