Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
126
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OD0105 # 04 Y:1998 | 04 | 1998 | INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE | $1,362 | $0 | Not Implemented |
OD0105 # 03 Y:1998 | 03 | 1998 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,120 | $5,907 | Implemented |
OD0105 # 02 Y:1998 | 02 | 1998 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $9,837 | $38,044 | Implemented |
OD0105 # 01 Y:1998 | 01 | 1998 | BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT | $56,890 | $175,200 | Implemented |
OD0125 # 06 Y:1998 | 06 | 1998 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $619 | $0 | Implemented |
OD0125 # 05 Y:1998 | 05 | 1998 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $4,293 | $1,295 | Not Implemented |
OD0125 # 04 Y:1998 | 04 | 1998 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $5,182 | $8,000 | Not Implemented |
OD0125 # 03 Y:1998 | 03 | 1998 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $6,650 | $630 | Implemented |
OD0125 # 02 Y:1998 | 02 | 1998 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $704 | $840 | Implemented |
OD0125 # 01 Y:1998 | 01 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,283 | $67,670 | Implemented |
OD0124 # 04 Y:1998 | 04 | 1998 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $7,805 | $4,595 | Not Implemented |
OD0124 # 03 Y:1998 | 03 | 1998 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,225 | $5,625 | Not Implemented |
OD0124 # 02 Y:1998 | 02 | 1998 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $437 | $1,290 | Not Implemented |
OD0124 # 01 Y:1998 | 01 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,935 | $6,012 | Implemented |
OD0123 # 01 Y:1998 | 01 | 1998 | USE OPTIMUM THICKNESS INSULATION | $7,666 | $21,040 | Not Implemented |
OD0123 # 04 Y:1998 | 04 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,239 | $16,477 | Not Implemented |
OD0123 # 03 Y:1998 | 03 | 1998 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $592 | $1,290 | Not Implemented |
OD0123 # 02 Y:1998 | 02 | 1998 | INSTALL OCCUPANCY SENSORS | $609 | $200 | Not Implemented |
OD0122 # 05 Y:1998 | 05 | 1998 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $1,545 | $93 | Implemented |
OD0122 # 01 Y:1998 | 01 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,564 | $3,171 | Not Implemented |
OD0122 # 02 Y:1998 | 02 | 1998 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,277 | $150 | Not Implemented |
OD0122 # 03 Y:1998 | 03 | 1998 | INSTALL OCCUPANCY SENSORS | $932 | $200 | Not Implemented |
OD0122 # 06 Y:1998 | 06 | 1998 | INSTALL TIMERS AND/OR THERMOSTATS | $2,871 | $1,050 | Implemented |
OD0122 # 04 Y:1998 | 04 | 1998 | SHUT OFF PILOTS IN STANDBY EQUIPMENT | $248 | $20 | Not Implemented |
OD0121 # 02 Y:1998 | 02 | 1998 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $3,843 | $9,910 | Not Implemented |