Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,386
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0744 # 05 Y:2021 | 05 | 2021 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $5,065 | $18,105 | Implemented |
OR0744 # 03 Y:2021 | 03 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $16,963 | $2,340 | Implemented |
OR0744 # 02 Y:2021 | 02 | 2021 | OPTIMIZE PLANT POWER FACTOR | $15,238 | $36,792 | Implemented |
OR0744 # 01 Y:2021 | 01 | 2021 | MINIMIZE WATER USAGE | $2,348 | $0 | Implemented |
OR0739 # 01 Y:2021 | 01 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,888 | $0 | Implemented |
OR0743 # 01 Y:2021 | 01 | 2021 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $46,625 | $0 | Implemented |
OR0743 # 03 Y:2021 | 03 | 2021 | STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS | $29,553 | $281,475 | Implemented |
OR0743 # 02 Y:2021 | 02 | 2021 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $4,808 | $8,548 | Implemented |
OR0742 # 02 Y:2021 | 02 | 2021 | REDESIGN PROCESS | $3,895 | $0 | Implemented |
OR0742 # 01 Y:2021 | 01 | 2021 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $4,010 | $0 | Implemented |
OR0740 # 07 Y:2021 | 07 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,547 | $3,289 | Implemented |
OR0740 # 06 Y:2021 | 06 | 2021 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $14,480 | $12,929 | Implemented |
OR0740 # 05 Y:2021 | 05 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $27,831 | $84,560 | Implemented |
OR0740 # 04 Y:2021 | 04 | 2021 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $39,964 | $60,439 | Implemented |
OR0740 # 03 Y:2021 | 03 | 2021 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $54,988 | $79,709 | Implemented |
OR0740 # 01 Y:2021 | 01 | 2021 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $69,219 | $8,189 | Implemented |
OR0737 # 04 Y:2021 | 04 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,884 | $0 | Implemented |
OR0737 # 05 Y:2021 | 05 | 2021 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $3,820 | $8,556 | Implemented |
OR0736 # 04 Y:2020 | 04 | 2020 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $922 | $114 | Implemented |
OR0736 # 03 Y:2020 | 03 | 2020 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,008 | $1,549 | Implemented |
OR0736 # 02 Y:2020 | 02 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,946 | $3,000 | Implemented |
OR0735 # 01 Y:2020 | 01 | 2020 | UPGRADE CONTROLS ON COMPRESSORS | $5,347 | $1,090 | Implemented |
OR0735 # 03 Y:2020 | 03 | 2020 | UPGRADE CONTROLS ON COMPRESSORS | $3,031 | $0 | Implemented |
OR0733 # 02 Y:2020 | 02 | 2020 | USE OPTIMUM TEMPERATURE | $3,294 | $5,000 | Implemented |
OR0732 # 02 Y:2020 | 02 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $20,378 | $0 | Implemented |