Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,913
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0796 # 03 Y:2024 | 03 | 2024 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $584 | $2,239 | n/a |
OR0796 # 01 Y:2024 | 01 | 2024 | INSTALL / REPAIR INSULATION ON STEAM LINES | $733 | $546 | n/a |
OR0796 # 02 Y:2024 | 02 | 2024 | ADOPT IN-HOUSE MATERIAL GENERATION | $86,946 | $168,430 | n/a |
OR0796 # 04 Y:2024 | 04 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $130,526 | $1,312,500 | n/a |
OR0795 # 02 Y:2024 | 02 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $45,995 | $522,500 | n/a |
OR0795 # 01 Y:2024 | 01 | 2024 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $1,159,650 | $2,267,496 | n/a |
OR0795 # 04 Y:2024 | 04 | 2024 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $4,228 | $13,714 | n/a |
OR0795 # 03 Y:2024 | 03 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $26,223 | $1,293 | n/a |
OR0794 # 02 Y:2024 | 02 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,287 | $5,523 | n/a |
OR0794 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,153 | $7,546 | n/a |
OR0794 # 03 Y:2024 | 03 | 2024 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $20,545 | $92,473 | n/a |
OR0794 # 06 Y:2024 | 06 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $13,489 | $12,623 | n/a |
OR0794 # 04 Y:2024 | 04 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $12,662 | $67,250 | n/a |
OR0794 # 01 Y:2024 | 01 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,236 | $1,629 | n/a |
OR0793 # 03 Y:2024 | 03 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,117 | $0 | n/a |
OR0793 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,695 | $522 | n/a |
OR0793 # 01 Y:2024 | 01 | 2024 | ADOPT IN-HOUSE MATERIAL GENERATION | $13,689 | $209,197 | n/a |
OR0791 # 03 Y:2024 | 03 | 2024 | OPTIMIZE PLANT POWER FACTOR | $2,606 | $17,324 | n/a |
OR0791 # 02 Y:2024 | 02 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,032 | $0 | n/a |
OR0791 # 01 Y:2024 | 01 | 2024 | MODIFY FACILITY TO AVOID EXCESS MAINTENANCE COSTS | $29,053 | $352,000 | n/a |
OR0791 # 04 Y:2024 | 04 | 2024 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,079 | $5,750 | n/a |
ORC014 # 02 Y:2024 | 02 | 2024 | INSTALL OCCUPANCY SENSORS | $4,418 | $448 | n/a |
ORC014 # 01 Y:2024 | 01 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,533 | $131,106 | n/a |
ORC014 # 03 Y:2024 | 03 | 2024 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $2,420 | $12,690 | n/a |
OR0790 # 01 Y:2024 | 01 | 2024 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $19,663 | $0 | n/a |