IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

140

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0487 # 02 Y:2005 02 2005 MINIMIZE WATER USAGE $51,000 $107,000 Not Implemented
OR0487 # 03 Y:2005 03 2005 USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) $39,000 $16,400 Not Implemented
OR0487 # 04 Y:2005 04 2005 INSTALL / REPAIR INSULATION ON STEAM LINES $17,600 $23,000 Not Implemented
OR0487 # 05 Y:2005 05 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,630 $0 Implemented
OR0487 # 06 Y:2005 06 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,637 $3,150 Implemented
OR0487 # 07 Y:2005 07 2005 INSTALL OCCUPANCY SENSORS $2,100 $104 Implemented
OR0487 # 08 Y:2005 08 2005 UPGRADE CONTROLS ON COMPRESSORS $1,500 $600 Not Implemented
OR0485 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,420 $6,500 Not Implemented
OR0485 # 02 Y:2005 02 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $19,180 $0 Not Implemented
OR0485 # 03 Y:2005 03 2005 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $6,760 $15,400 Not Implemented
OR0485 # 04 Y:2005 04 2005 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $64,700 $19,500 Not Implemented
OR0485 # 05 Y:2005 05 2005 OPTIMIZE PLANT POWER FACTOR $13,480 $12,250 Not Implemented
OR0485 # 06 Y:2005 06 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $12,250 $0 Not Implemented
OR0485 # 07 Y:2005 07 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $64,000 $134,000 Not Implemented
OR0485 # 08 Y:2005 08 2005 INSTALL / REPAIR INSULATION ON STEAM LINES $735 $2,410 Not Implemented
OR0484 # 01 Y:2005 01 2005 USE RADIANT HEATER FOR SPOT HEATING $41,089 $40,143 Not Implemented
OR0484 # 02 Y:2005 02 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,710 $400 Not Implemented
OR0484 # 03 Y:2005 03 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $847 $1,013 Implemented
OR0483 # 01 Y:2005 01 2005 RECOVER AND REUSE WASTE MATERIAL $21,624 $0 Implemented
OR0483 # 02 Y:2005 02 2005 DIRECT WARMEST AIR TO COMBUSTION INTAKE $24,290 $4,400 Implemented
OR0483 # 03 Y:2005 03 2005 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $21,300 $5,100 Implemented
OR0483 # 04 Y:2005 04 2005 $8,960 $3,000 Implemented
OR0483 # 05 Y:2005 05 2005 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT $41,000 $69,000 Implemented
OR0483 # 06 Y:2005 06 2005 $40,390 $72,000 Implemented
OR0483 # 07 Y:2005 07 2005 USE HEAT EXCHANGE FLUIDS INSTEAD OF STEAM IN PIPELINE TRACING SYSTEMS $5,131 $15,000 Not Implemented