IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,550

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0515 # 04 Y:2007 04 2007 INSTALL SKYLIGHTS $1,900 $5,000 Not Implemented
OR0514 # 01 Y:2007 01 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,300 $0 Implemented
OR0514 # 02 Y:2007 02 2007 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $135,120 $4,350 Not Implemented
OR0514 # 03 Y:2007 03 2007 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $3,900 $500 Not Implemented
OR0514 # 04 Y:2007 04 2007 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $4,400 $1,000 Not Implemented
OR0514 # 05 Y:2007 05 2007 DEVELOP STANDARD OPERATING PROCEDURES $204,000 $18,800 Not Implemented
OR0514 # 06 Y:2007 06 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $500 $7,700 Implemented
OR0514 # 07 Y:2007 07 2007 UPGRADE CONTROLS ON COMPRESSORS $16,800 $11,500 Not Implemented
OR0514 # 08 Y:2007 08 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $34,700 $0 Implemented
OR0514 # 09 Y:2007 09 2007 INSTALL TIMERS AND/OR THERMOSTATS $4,900 $7,400 Not Implemented
OR0505 # 01 Y:2006 01 2006 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $18,900 $0 Implemented
OR0505 # 02 Y:2006 02 2006 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,600 $0 Implemented
OR0505 # 03 Y:2006 03 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,000 $0 Not Implemented
OR0505 # 04 Y:2006 04 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,300 $600 Not Implemented
OR0505 # 05 Y:2006 05 2006 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $36,760 $2,700 Not Implemented
OR0505 # 06 Y:2006 06 2006 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $17,000 $8,000 Not Implemented
OR0505 # 07 Y:2006 07 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,000 $1,000 Not Implemented
OR0505 # 08 Y:2006 08 2006 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $168,270 $185,000 Implemented
OR0505 # 09 Y:2006 09 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $11,100 $32,300 Not Implemented
OR0507 # 01 Y:2006 01 2006 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $2,600 $0 Implemented
OR0507 # 02 Y:2006 02 2006 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $46,800 $2,000 Implemented
OR0507 # 03 Y:2006 03 2006 USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) $13,600 $3,200 Not Implemented
OR0507 # 04 Y:2006 04 2006 KEEP BOILER TUBES CLEAN $13,700 $4,000 Implemented
OR0507 # 05 Y:2006 05 2006 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $40,000 $1,500 Implemented
OR0507 # 06 Y:2006 06 2006 ADD ADDITIONAL PRODUCTION SHIFT $60,100 $41,100 Implemented