IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,913

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ORC009 # 01 Y:2023 01 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $654 $2,000 Not Implemented
ORC009 # 02 Y:2023 02 2023 REPLACE BOILER $1,624 $10,000 Not Implemented
ORC009 # 03 Y:2023 03 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $178 $500 Not Implemented
ORC009 # 04 Y:2023 04 2023 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $83 $400 Not Implemented
ORC009 # 05 Y:2023 05 2023 INSTALL OCCUPANCY SENSORS $307 $200 Not Implemented
OR0770 # 01 Y:2023 01 2023 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $2,142 $6,704 Implemented
OR0770 # 02 Y:2023 02 2023 REDUCE SCRAP PRODUCTION $111,700 $282,420 Not Implemented
OR0770 # 03 Y:2023 03 2023 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $4,249 $9,000 Implemented
OR0770 # 04 Y:2023 04 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $206 $0 Not Implemented
ORC008 # 01 Y:2023 01 2023 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $2,876 $500 Not Implemented
ORC008 # 02 Y:2023 02 2023 INSTALL OCCUPANCY SENSORS $474 $100 Not Implemented
ORC008 # 03 Y:2023 03 2023 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $959 $1,500 Not Implemented
ORC008 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,527 $4,000 Not Implemented
ORC008 # 05 Y:2023 05 2023 USE HEAT PUMP FOR SPACE CONDITIONING $668 $5,000 Not Implemented
ORC008 # 06 Y:2023 06 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,574 $500 Not Implemented
ORC007 # 01 Y:2023 01 2023 INSTALL OCCUPANCY SENSORS $765 $5,150 Not Implemented
ORC007 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,853 $26,400 Not Implemented
ORC007 # 03 Y:2023 03 2023 REDUCE VENTILATION AIR $3,082 $200 Implemented
ORC007 # 04 Y:2023 04 2023 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $808 $50 Implemented
ORC007 # 05 Y:2023 05 2023 CHANGE ZONE REHEAT COILS TO VARIABLE AIR VOLUME BOXES $2,696 $200 Implemented
ORC007 # 06 Y:2023 06 2023 USE HEAT PUMP FOR SPACE CONDITIONING $535 $5,000 Not Implemented
ORC007 # 07 Y:2023 07 2023 REPLACE BOILER $3,485 $30,000 Not Implemented
OR0768 # 01 Y:2023 01 2023 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $18,535 $8,125 Implemented
OR0768 # 02 Y:2023 02 2023 USE AUTOMATIC FLOW CONTROL $24,867 $9,600 Not Implemented
OR0768 # 03 Y:2023 03 2023 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $11,178 $5,693 Implemented