Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
110
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0405 # 03 Y:2001 | 03 | 2001 | INSTALL SENSORS TO DETECT AND AVOID JAMS | $116,900 | $20,000 | Not Implemented |
OR0405 # 07 Y:2001 | 07 | 2001 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $3,092 | $13,700 | Not Implemented |
OR0405 # 02 Y:2001 | 02 | 2001 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $879,623 | $145,450 | Implemented |
OR0405 # 01 Y:2001 | 01 | 2001 | INSTALL EQUIPMENT TO MOVE PRODUCT | $265,366 | $900,000 | Not Implemented |
OR0405 # 04 Y:2001 | 04 | 2001 | OPTIMIZE PLANT POWER FACTOR | $17,987 | $28,200 | Implemented |
OR0405 # 05 Y:2001 | 05 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,599 | $4,500 | Implemented |
OR0405 # 06 Y:2001 | 06 | 2001 | UPGRADE CONTROLS ON COMPRESSORS | $13,877 | $4,000 | Implemented |
OR0404 # 05 Y:2001 | 05 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $448 | $500 | Implemented |
OR0404 # 04 Y:2001 | 04 | 2001 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $859 | $2,400 | Implemented |
OR0404 # 06 Y:2001 | 06 | 2001 | OPTIMIZE PLANT POWER FACTOR | $250 | $700 | Not Implemented |
OR0404 # 02 Y:2001 | 02 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,457 | $1,102 | Implemented |
OR0403 # 02 Y:2001 | 02 | 2001 | INSTALL AUTOMATIC PACKING EQUIPMENT | $18,830 | $27,000 | Not Implemented |
OR0404 # 03 Y:2001 | 03 | 2001 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $546 | $1,065 | Implemented |
OR0404 # 01 Y:2001 | 01 | 2001 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $25,650 | $0 | Implemented |
OR0403 # 03 Y:2001 | 03 | 2001 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,010 | $0 | Implemented |
OR0403 # 01 Y:2001 | 01 | 2001 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $20,460 | $860 | Implemented |
OR0403 # 04 Y:2001 | 04 | 2001 | ADD AREA LIGHTING SWITCHES | $645 | $1,400 | Not Implemented |
OR0402 # 02 Y:2001 | 02 | 2001 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $6,880 | $1,230 | Implemented |
OR0402 # 04 Y:2001 | 04 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,194 | $3,600 | Not Implemented |
OR0402 # 01 Y:2001 | 01 | 2001 | UPGRADE OBSOLETE EQUIPMENT | $53,000 | $45,000 | Implemented |
OR0402 # 03 Y:2001 | 03 | 2001 | OPTIMIZE PLANT POWER FACTOR | $1,310 | $1,100 | Not Implemented |
OR0401 # 07 Y:2001 | 07 | 2001 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $270,000 | $50,000 | Not Implemented |
OR0401 # 04 Y:2001 | 04 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $560,470 | $690,000 | Not Implemented |
OR0401 # 03 Y:2001 | 03 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $56,333 | $68,000 | Implemented |
OR0401 # 06 Y:2001 | 06 | 2001 | DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | $473,166 | $120,000 | Not Implemented |