Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,103
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0240 # 03 Y:2000 | 03 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $193 | $714 | Implemented |
SD0240 # 04 Y:2000 | 04 | 2000 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $52,416 | $31,000 | Not Implemented |
SD0240 # 05 Y:2000 | 05 | 2000 | OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS | $6,552 | $6,000 | Implemented |
SD0239 # 01 Y:2000 | 01 | 2000 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,960 | $300 | Not Implemented |
SD0239 # 02 Y:2000 | 02 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,716 | $0 | Implemented |
SD0239 # 03 Y:2000 | 03 | 2000 | CONVERT TO ELECTROSTATIC POWDER COATING | $7,470 | $56,000 | Not Implemented |
SD0239 # 04 Y:2000 | 04 | 2000 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $45,475 | $66,000 | Not Implemented |
SD0239 # 05 Y:2000 | 05 | 2000 | IMPROVE SPACE COMFORT CONDITIONING | $40,500 | $7,500 | Implemented |
SD0237 # 01 Y:2000 | 01 | 2000 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $28,985 | $88,000 | Implemented |
SD0237 # 02 Y:2000 | 02 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,408 | $2,800 | Implemented |
SD0237 # 03 Y:2000 | 03 | 2000 | REDUCE EXCESSIVE BOILER BLOWDOWN | $688 | $100 | Implemented |
SD0237 # 04 Y:2000 | 04 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,766 | $9,903 | Not Implemented |
SD0237 # 05 Y:2000 | 05 | 2000 | INSTALL SPECTRAL REFLECTORS / DELAMP | $4,525 | $6,910 | Not Implemented |
SD0237 # 06 Y:2000 | 06 | 2000 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $6,740 | $8,500 | Not Implemented |
SD0237 # 07 Y:2000 | 07 | 2000 | MINIMIZE WATER USAGE | $646 | $100 | Implemented |
SD0237 # 08 Y:2000 | 08 | 2000 | INSTALL AUTOMATIC PACKING EQUIPMENT | $40,972 | $7,200 | Implemented |
SD0237 # 09 Y:2000 | 09 | 2000 | INSTALL AUTOMATIC PACKING EQUIPMENT | $20,236 | $26,000 | Not Implemented |
SD0236 # 01 Y:2000 | 01 | 2000 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $11,527 | $8,000 | Not Implemented |
SD0236 # 02 Y:2000 | 02 | 2000 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $271,210 | $1,150,000 | Implemented |
SD0236 # 03 Y:2000 | 03 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,260 | $17,300 | Not Implemented |
SD0236 # 04 Y:2000 | 04 | 2000 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $862 | $388 | Implemented |
SD0236 # 05 Y:2000 | 05 | 2000 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $539 | $0 | Implemented |
SD0236 # 06 Y:2000 | 06 | 2000 | ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS | $29,288 | $0 | Not Implemented |
SD0229 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,875 | $2,988 | Implemented |
SD0229 # 02 Y:1999 | 02 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $13,528 | $10,000 | Not Implemented |