IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,103

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0480 # 01 Y:2014 01 2014 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $102,356 $456,500 Not Implemented
SD0480 # 02 Y:2014 02 2014 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $58,476 $249,000 Not Implemented
SD0480 # 03 Y:2014 03 2014 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $13,051 $52,333 Not Implemented
SD0480 # 04 Y:2014 04 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,662 $300 Implemented
SD0480 # 05 Y:2014 05 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,971 $5,075 Not Implemented
SD0480 # 06 Y:2014 06 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,686 $4,500 Not Implemented
SD0480 # 07 Y:2014 07 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,176 $3,050 Not Implemented
SD0480 # 08 Y:2014 08 2014 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $634 $370 Not Implemented
SD0478 # 01 Y:2014 01 2014 REDUCE SCRAP PRODUCTION $30,811 $12,465 Implemented
SD0478 # 02 Y:2014 02 2014 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $13,342 $32,990 Not Implemented
SD0478 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,128 $500 Implemented
SD0478 # 04 Y:2014 04 2014 INSTALL OCCUPANCY SENSORS $2,630 $2,535 Implemented
SD0478 # 05 Y:2014 05 2014 USE PHOTOCELL CONTROLS $2,220 $4,625 Implemented
SD0477 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,922 $17,910 Not Implemented
SD0477 # 02 Y:2013 02 2013 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,803 $9,900 Not Implemented
SD0477 # 03 Y:2013 03 2013 INSULATE BARE EQUIPMENT $2,635 $4,905 Not Implemented
SD0477 # 04 Y:2013 04 2013 USE PHOTOCELL CONTROLS $2,407 $4,140 Not Implemented
SD0477 # 05 Y:2013 05 2013 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,263 $200 Implemented
SD0477 # 06 Y:2013 06 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,737 $5,300 Not Implemented
SD0477 # 07 Y:2013 07 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $646 $300 Not Implemented
SD0476 # 01 Y:2013 01 2013 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $78,108 $360,000 Not Implemented
SD0476 # 02 Y:2013 02 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $23,282 $33,000 Implemented
SD0476 # 03 Y:2013 03 2013 IMPROVE COMBUSTION CONTROL CAPABILITY $6,115 $200 Not Implemented
SD0476 # 04 Y:2013 04 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,485 $13,830 Implemented
SD0476 # 05 Y:2013 05 2013 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,573 $6,995 Implemented