IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

185

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0330 # 06 Y:2003 06 2003 $96,800 $200,000 Not Implemented
SD0330 # 02 Y:2003 02 2003 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,189 $6,000 Not Implemented
SD0330 # 01 Y:2003 01 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $20,782 $1,425 Not Implemented
SD0330 # 05 Y:2003 05 2003 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $3,500 $10,000 Not Implemented
SD0330 # 03 Y:2003 03 2003 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,836 $4,000 Not Implemented
SD0330 # 04 Y:2003 04 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $887 $80 Implemented
SD0329 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,418 $380 Implemented
SD0329 # 04 Y:2003 04 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,811 $6,912 Not Implemented
SD0329 # 01 Y:2003 01 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $30,850 $15,600 Not Implemented
SD0329 # 03 Y:2003 03 2003 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $5,587 $320 Not Implemented
SD0329 # 05 Y:2003 05 2003 USE PHOTOCELL CONTROLS $1,360 $1,000 Not Implemented
SD0328 # 02 Y:2003 02 2003 INSTALL SKYLIGHTS $5,260 $6,650 Not Implemented
SD0328 # 04 Y:2003 04 2003 INSTALL OCCUPANCY SENSORS $747 $400 Not Implemented
SD0328 # 03 Y:2003 03 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,323 $0 Implemented
SD0328 # 08 Y:2003 08 2003 REDESIGN PROCESS $55,557 $24,000 Not Implemented
SD0328 # 05 Y:2003 05 2003 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $12,600 $11,000 Not Implemented
SD0328 # 01 Y:2003 01 2003 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $269,910 $1,371,000 Implemented
SD0328 # 06 Y:2003 06 2003 REDUCE SCRAP PRODUCTION $4,246 $342 Not Implemented
SD0328 # 07 Y:2003 07 2003 $401,960 $800,000 Not Implemented
SD0327 # 04 Y:2003 04 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $608 $32 Not Implemented
SD0327 # 03 Y:2003 03 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,257 $3,225 Not Implemented
SD0327 # 01 Y:2003 01 2003 UPGRADE OBSOLETE EQUIPMENT $50,120 $850,000 Not Implemented
SD0327 # 02 Y:2003 02 2003 USE COLD WASTE WATER TO COOL CHILLER FEED WATER $15,838 $12,500 Not Implemented
SD0327 # 05 Y:2003 05 2003 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,124 $5,000 Not Implemented
SD0321 # 06 Y:2003 06 2003 USE PHOTOCELL CONTROLS $1,476 $582 Not Implemented