IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

84

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0590 # 04 Y:2019 04 2019 INSTALL OCCUPANCY SENSORS $319 $585 Implemented
SD0590 # 02 Y:2019 02 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,948 $0 Implemented
SD0590 # 01 Y:2019 01 2019 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $12,001 $8,840 Not Implemented
SD0590 # 03 Y:2019 03 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $880 $120 Implemented
SD0589 # 03 Y:2019 03 2019 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $242 $120 Implemented
SD0589 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,426 $8,840 Implemented
SD0589 # 02 Y:2019 02 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $442 $0 Implemented
SD0588 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $407 $0 Implemented
SD0588 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,633 $32,287 Implemented
SD0588 # 02 Y:2019 02 2019 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,578 $7,495 Implemented
SD0588 # 03 Y:2019 03 2019 INSTALL OCCUPANCY SENSORS $812 $1,395 Implemented
SD0587 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,956 $5,187 Not Implemented
SD0587 # 01 Y:2019 01 2019 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $15,684 $52,500 Implemented
SD0587 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,075 $0 Implemented
SD0587 # 04 Y:2019 04 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $631 $522 Not Implemented
SD0586 # 01 Y:2019 01 2019 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $57,437 $117,800 Implemented
SD0586 # 06 Y:2019 06 2019 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $1,834 $2,795 Implemented
SD0586 # 05 Y:2019 05 2019 INSTALL OCCUPANCY SENSORS $1,882 $330 Implemented
SD0586 # 07 Y:2019 07 2019 INSTALL TIMERS AND/OR THERMOSTATS $1,750 $350 Implemented
SD0586 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,164 $24,783 Implemented
SD0586 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,460 $0 Implemented
SD0586 # 08 Y:2019 08 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,943 $750 Not Implemented
SD0586 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,548 $17,875 Implemented
SD0585 # 04 Y:2019 04 2019 USE PHOTOCELL CONTROLS $2,188 $3,520 Not Implemented
SD0585 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,052 $8,453 Implemented