Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
185
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0330 # 06 Y:2003 | 06 | 2003 | AUTOMATE FINISHING PROCESS | $96,800 | $200,000 | Not Implemented |
SD0330 # 02 Y:2003 | 02 | 2003 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $3,189 | $6,000 | Not Implemented |
SD0330 # 01 Y:2003 | 01 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $20,782 | $1,425 | Not Implemented |
SD0330 # 05 Y:2003 | 05 | 2003 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $3,500 | $10,000 | Not Implemented |
SD0330 # 03 Y:2003 | 03 | 2003 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,836 | $4,000 | Not Implemented |
SD0330 # 04 Y:2003 | 04 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $887 | $80 | Implemented |
SD0329 # 02 Y:2003 | 02 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,418 | $380 | Implemented |
SD0329 # 04 Y:2003 | 04 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,811 | $6,912 | Not Implemented |
SD0329 # 01 Y:2003 | 01 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $30,850 | $15,600 | Not Implemented |
SD0329 # 03 Y:2003 | 03 | 2003 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $5,587 | $320 | Not Implemented |
SD0329 # 05 Y:2003 | 05 | 2003 | USE PHOTOCELL CONTROLS | $1,360 | $1,000 | Not Implemented |
SD0328 # 02 Y:2003 | 02 | 2003 | INSTALL SKYLIGHTS | $5,260 | $6,650 | Not Implemented |
SD0328 # 04 Y:2003 | 04 | 2003 | INSTALL OCCUPANCY SENSORS | $747 | $400 | Not Implemented |
SD0328 # 03 Y:2003 | 03 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,323 | $0 | Implemented |
SD0328 # 08 Y:2003 | 08 | 2003 | REDESIGN PROCESS | $55,557 | $24,000 | Not Implemented |
SD0328 # 05 Y:2003 | 05 | 2003 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $12,600 | $11,000 | Not Implemented |
SD0328 # 01 Y:2003 | 01 | 2003 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $269,910 | $1,371,000 | Implemented |
SD0328 # 06 Y:2003 | 06 | 2003 | REDUCE SCRAP PRODUCTION | $4,246 | $342 | Not Implemented |
SD0328 # 07 Y:2003 | 07 | 2003 | INSTALL AUTOMATIC PACKING EQUIPMENT | $401,960 | $800,000 | Not Implemented |
SD0327 # 04 Y:2003 | 04 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $608 | $32 | Not Implemented |
SD0327 # 03 Y:2003 | 03 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,257 | $3,225 | Not Implemented |
SD0327 # 01 Y:2003 | 01 | 2003 | UPGRADE OBSOLETE EQUIPMENT | $50,120 | $850,000 | Not Implemented |
SD0327 # 02 Y:2003 | 02 | 2003 | USE COLD WASTE WATER TO COOL CHILLER FEED WATER | $15,838 | $12,500 | Not Implemented |
SD0327 # 05 Y:2003 | 05 | 2003 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $2,124 | $5,000 | Not Implemented |
SD0321 # 06 Y:2003 | 06 | 2003 | USE PHOTOCELL CONTROLS | $1,476 | $582 | Not Implemented |