Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,535
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0462 # 03 Y:2015 | 03 | 2015 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,475 | $793 | Implemented |
SF0462 # 04 Y:2015 | 04 | 2015 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $2,104 | $1,941 | Implemented |
SF0462 # 07 Y:2015 | 07 | 2015 | INSTALL OCCUPANCY SENSORS | $2,234 | $4,284 | Implemented |
SF0462 # 08 Y:2015 | 08 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,459 | $24,914 | Implemented |
SF0461 # 01 Y:2015 | 01 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,239 | $75 | Implemented |
SF0461 # 02 Y:2015 | 02 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,905 | $3,053 | Implemented |
SF0461 # 03 Y:2015 | 03 | 2015 | INSTALL OCCUPANCY SENSORS | $2,517 | $4,371 | Implemented |
SF0461 # 04 Y:2015 | 04 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,570 | $7,605 | Implemented |
SF0461 # 05 Y:2015 | 05 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $28,819 | $80,476 | Implemented |
SF0461 # 08 Y:2015 | 08 | 2015 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $666 | $50 | Implemented |
SF0459 # 01 Y:2015 | 01 | 2015 | REPAIR OR REPLACE STEAM TRAPS | $29,918 | $5,047 | Implemented |
SF0459 # 02 Y:2015 | 02 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $391 | $0 | Implemented |
SF0459 # 06 Y:2015 | 06 | 2015 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $23,360 | $14,429 | Implemented |
SF0459 # 07 Y:2015 | 07 | 2015 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $3,292 | $1,945 | Implemented |
SF0459 # 11 Y:2015 | 11 | 2015 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $17,754 | $22,786 | Implemented |
SF0459 # 12 Y:2015 | 12 | 2015 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $58,197 | $81,522 | Implemented |
SF0459 # 13 Y:2015 | 13 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,158 | $24,030 | Implemented |
SF0459 # 14 Y:2015 | 14 | 2015 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $42,975 | $82,916 | Implemented |
SF0459 # 17 Y:2015 | 17 | 2015 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $166,472 | $100,519 | Implemented |
SF0460 # 02 Y:2015 | 02 | 2015 | REPAIR AND ELIMINATE STEAM LEAKS | $5,167 | $624 | Implemented |
SF0460 # 05 Y:2015 | 05 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,462 | $9,228 | Implemented |
SF0460 # 08 Y:2015 | 08 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,062 | $3,703 | Implemented |
SF0458 # 01 Y:2014 | 01 | 2014 | REPAIR AND ELIMINATE STEAM LEAKS | $6,859 | $840 | Implemented |
SF0458 # 03 Y:2014 | 03 | 2014 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,339 | $0 | Implemented |
SF0458 # 04 Y:2014 | 04 | 2014 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $1,582 | $522 | Implemented |