IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

60

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0397 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,394 $0 Implemented
SF0397 # 01 Y:2011 01 2011 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $12,161 $0 Implemented
SF0396 # 04 Y:2011 04 2011 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $339 $310 Implemented
SF0396 # 05 Y:2011 05 2011 INSTALL OCCUPANCY SENSORS $5,645 $7,073 Implemented
SF0396 # 06 Y:2011 06 2011 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $605 $1,540 Implemented
SF0396 # 08 Y:2011 08 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,045 $22,410 Implemented
SF0396 # 09 Y:2011 09 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $583 $2,107 Implemented
SF0396 # 10 Y:2011 10 2011 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $5,040 $23,228 Implemented
SF0396 # 02 Y:2011 02 2011 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,498 $1,199 Implemented
SF0396 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,923 $0 Implemented
SF0395 # 04 Y:2011 04 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,313 $7,243 Implemented
SF0395 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,312 $0 Implemented
SF0395 # 01 Y:2011 01 2011 INSTALL TIMERS AND/OR THERMOSTATS $6,724 $0 Implemented
SF0395 # 06 Y:2011 06 2011 USE COMPRESSOR AIR FILTERS $1,038 $1,467 Implemented
SF0395 # 10 Y:2011 10 2011 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $4,772 $18,000 Implemented
SF0395 # 09 Y:2011 09 2011 INSULATE BARE EQUIPMENT $8,140 $22,037 Implemented
SF0395 # 07 Y:2011 07 2011 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $13,112 $6,182 Implemented
SF0395 # 05 Y:2011 05 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,833 $5,753 Implemented
SF0394 # 02 Y:2011 02 2011 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $439 $235 Implemented
SF0394 # 07 Y:2011 07 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $241 $700 Implemented
SF0394 # 06 Y:2011 06 2011 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $7,794 $20,780 Implemented
SF0394 # 05 Y:2011 05 2011 INSTALL OCCUPANCY SENSORS $7,621 $11,002 Implemented
SF0394 # 04 Y:2011 04 2011 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $2,879 $3,638 Implemented
SF0394 # 03 Y:2011 03 2011 OPTIMIZE PLANT POWER FACTOR $2,952 $3,821 Implemented
SF0394 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,204 $73 Implemented