Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,202
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0621 # 08 Y:2024 | 08 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $6,248 | $2,796 | n/a |
SF0621 # 10 Y:2024 | 10 | 2024 | INSTALL ISOLATION TRANSFORMER ON ADJUSTABLE FREQUENCY DRIVE | $26,726 | $23,394 | n/a |
SF0621 # 01 Y:2024 | 01 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $12,755 | $300 | n/a |
SF0620 # 07 Y:2024 | 07 | 2024 | USE BATTERY STORAGE FOR DEMAND CONTROL | $511,502 | $6,765,825 | n/a |
SF0620 # 03 Y:2024 | 03 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $81,460 | $95,723 | n/a |
SF0620 # 06 Y:2024 | 06 | 2024 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $1,786,404 | $4,187,700 | n/a |
SF0620 # 01 Y:2024 | 01 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $101,612 | $3,840 | n/a |
SF0620 # 02 Y:2024 | 02 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $39,113 | $24,553 | n/a |
SF0620 # 05 Y:2024 | 05 | 2024 | UPGRADE OBSOLETE EQUIPMENT | $83,597 | $429,096 | n/a |
SF0620 # 04 Y:2024 | 04 | 2024 | UPGRADE OBSOLETE EQUIPMENT | $11,663 | $52,983 | n/a |
SF0619 # 09 Y:2024 | 09 | 2024 | INSULATE BARE EQUIPMENT | $2,201 | $2,875 | n/a |
SF0619 # 11 Y:2024 | 11 | 2024 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $52,391 | $160,125 | n/a |
SF0619 # 08 Y:2024 | 08 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $6,389 | $4,926 | n/a |
SF0619 # 02 Y:2024 | 02 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,589 | $220 | n/a |
SF0619 # 10 Y:2024 | 10 | 2024 | INSTALL OCCUPANCY SENSORS | $292 | $785 | n/a |
SF0619 # 05 Y:2024 | 05 | 2024 | USE MINIMUM STEAM OPERATING PRESSURE | $7,106 | $2,700 | n/a |
SF0619 # 07 Y:2024 | 07 | 2024 | INSTALL STEAM TRAP | $531,211 | $270,719 | n/a |
SF0619 # 06 Y:2024 | 06 | 2024 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $90,155 | $37,058 | n/a |
SF0619 # 12 Y:2024 | 12 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,993 | $16,268 | n/a |
SF0619 # 04 Y:2024 | 04 | 2024 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $39,174 | $7,044 | n/a |
SF0619 # 03 Y:2024 | 03 | 2024 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $241 | $0 | n/a |
SF0619 # 01 Y:2024 | 01 | 2024 | REPAIR AND ELIMINATE STEAM LEAKS | $4,612 | $0 | n/a |
SF0618 # 08 Y:2024 | 08 | 2024 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $22,115 | $60,335 | n/a |
SF0618 # 04 Y:2024 | 04 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,266 | $3,170 | n/a |
SF0618 # 02 Y:2024 | 02 | 2024 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $4,735 | $1,500 | n/a |