IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,058

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0621 # 04 Y:2024 04 2024 ELIMINATE LEAKS IN WATER LINES AND VALVES $7,560 $700 n/a
SF0621 # 09 Y:2024 09 2024 INSULATE BARE EQUIPMENT $17,564 $9,294 n/a
SF0621 # 05 Y:2024 05 2024 INSTALL STEAM TRAP $9,822 $1,988 n/a
SF0620 # 07 Y:2024 07 2024 USE BATTERY STORAGE FOR DEMAND CONTROL $511,502 $6,765,825 n/a
SF0620 # 05 Y:2024 05 2024 UPGRADE OBSOLETE EQUIPMENT $83,597 $429,096 n/a
SF0620 # 04 Y:2024 04 2024 UPGRADE OBSOLETE EQUIPMENT $11,663 $52,983 n/a
SF0620 # 06 Y:2024 06 2024 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $1,786,404 $4,187,700 n/a
SF0620 # 03 Y:2024 03 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $81,460 $95,723 n/a
SF0620 # 01 Y:2024 01 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $101,612 $3,840 n/a
SF0620 # 02 Y:2024 02 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $39,113 $24,553 n/a
SF0619 # 09 Y:2024 09 2024 INSULATE BARE EQUIPMENT $2,201 $2,875 n/a
SF0619 # 10 Y:2024 10 2024 INSTALL OCCUPANCY SENSORS $292 $785 n/a
SF0619 # 05 Y:2024 05 2024 USE MINIMUM STEAM OPERATING PRESSURE $7,106 $2,700 n/a
SF0619 # 01 Y:2024 01 2024 REPAIR AND ELIMINATE STEAM LEAKS $4,612 $0 n/a
SF0619 # 12 Y:2024 12 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,993 $16,268 n/a
SF0619 # 07 Y:2024 07 2024 INSTALL STEAM TRAP $531,211 $270,719 n/a
SF0619 # 08 Y:2024 08 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,389 $4,926 n/a
SF0619 # 02 Y:2024 02 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,589 $220 n/a
SF0619 # 06 Y:2024 06 2024 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $90,155 $37,058 n/a
SF0619 # 03 Y:2024 03 2024 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $241 $0 n/a
SF0619 # 04 Y:2024 04 2024 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $39,174 $7,044 n/a
SF0619 # 11 Y:2024 11 2024 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $52,391 $160,125 n/a
SF0618 # 05 Y:2024 05 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,359 $2,340 n/a
SF0618 # 06 Y:2024 06 2024 REDESIGN PROCESS $59,966 $75,700 n/a
SF0618 # 07 Y:2024 07 2024 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $9,674 $19,158 n/a