IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

120

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0541 # 06 Y:2019 06 2019 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $261 $578 Implemented
SF0541 # 07 Y:2019 07 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $50,599 $153,278 Implemented
SF0541 # 08 Y:2019 08 2019 INSULATE BARE EQUIPMENT $2,727 $8,304 Implemented
SF0541 # 09 Y:2019 09 2019 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $36,428 $115,019 Implemented
SF0541 # 10 Y:2019 10 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,140 $26,538 Implemented
SF0541 # 11 Y:2019 11 2019 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $49,416 $245,226 Not Implemented
SF0537 # 01 Y:2019 01 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $14,931 $378 Not Implemented
SF0537 # 02 Y:2019 02 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $14,708 $260 Implemented
SF0537 # 03 Y:2019 03 2019 PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT $94,349 $10,000 Not Implemented
SF0537 # 04 Y:2019 04 2019 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $5,414 $648 Implemented
SF0537 # 05 Y:2019 05 2019 PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT $24,937 $5,000 Not Implemented
SF0537 # 06 Y:2019 06 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,025 $5,039 Implemented
SF0537 # 07 Y:2019 07 2019 PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT $2,238 $3,000 Implemented
SF0537 # 08 Y:2019 08 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $77,542 $235,055 Implemented
SF0537 # 09 Y:2019 09 2019 LOWER OPERATING PRESSURE OF CONDENSER (STEAM) $41,345 $175,000 Not Implemented
SF0540 # 01 Y:2019 01 2019 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $3,623 $0 Implemented
SF0540 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,827 $0 Implemented
SF0540 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,339 $325 Implemented
SF0540 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,918 $19,682 Implemented
SF0540 # 05 Y:2019 05 2019 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $242 $688 Implemented
SF0540 # 06 Y:2019 06 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,740 $21,083 Implemented
SF0540 # 07 Y:2019 07 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $99,319 $402,121 Not Implemented
SF0538 # 01 Y:2019 01 2019 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $146,044 $0 Not Implemented
SF0538 # 02 Y:2019 02 2019 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $29,680 $12,500 Implemented
SF0538 # 03 Y:2019 03 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $15,353 $5,947 Implemented