IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

201

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0218 # 09 Y:2001 09 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $565 $2,735 Not Implemented
SF0218 # 10 Y:2001 10 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,579 $15,374 Not Implemented
SF0215 # 01 Y:2001 01 2001 APPLY A PROTECTIVE COATING TO RACKS AND TANKS $3,452 $0 Implemented
SF0215 # 02 Y:2001 02 2001 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $9,984 $4,574 Implemented
SF0215 # 03 Y:2001 03 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,711 $1,366 Not Implemented
SF0215 # 04 Y:2001 04 2001 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $12,982 $13,500 Not Implemented
SF0215 # 05 Y:2001 05 2001 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $46,103 $50,000 Implemented
SF0215 # 06 Y:2001 06 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,758 $3,291 Implemented
SF0215 # 07 Y:2001 07 2001 INSTALL OCCUPANCY SENSORS $6,547 $14,341 Implemented
SF0215 # 08 Y:2001 08 2001 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $5,806 $14,760 n/a
SF0215 # 09 Y:2001 09 2001 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,329 $3,400 Not Implemented
SF0215 # 10 Y:2001 10 2001 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $33,374 $128,000 n/a
SF0215 # 11 Y:2001 11 2001 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $219,121 $0 Implemented
SF0215 # 12 Y:2001 12 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $3,216 $0 Not Implemented
SF0215 # 13 Y:2001 13 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $461,186 $60,000 n/a
SF0215 # 14 Y:2001 14 2001 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $139,058 $35,200 n/a
SF0215 # 15 Y:2001 15 2001 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $5,003 $5,111 Implemented
SF0217 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,715 $0 Implemented
SF0217 # 02 Y:2001 02 2001 REPAIR AND ELIMINATE STEAM LEAKS $611 $0 Implemented
SF0217 # 03 Y:2001 03 2001 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $2,551 $248 Implemented
SF0217 # 04 Y:2001 04 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,181 $3,150 Implemented
SF0217 # 05 Y:2001 05 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,600 $1,761 Implemented
SF0217 # 06 Y:2001 06 2001 INSULATE BARE EQUIPMENT $730 $1,032 Implemented
SF0217 # 07 Y:2001 07 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,141 $2,088 Not Implemented
SF0217 # 08 Y:2001 08 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,410 $15,510 Implemented