Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
148
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0421 # 02 Y:2012 | 02 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,017 | $0 | Implemented |
SF0421 # 06 Y:2012 | 06 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,282 | $29,386 | Implemented |
SF0421 # 04 Y:2012 | 04 | 2012 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $24,965 | $104,550 | Not Implemented |
SF0421 # 05 Y:2012 | 05 | 2012 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $8,801 | $22,991 | Implemented |
SF0421 # 03 Y:2012 | 03 | 2012 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $5,494 | $10,564 | Not Implemented |
SF0420 # 02 Y:2012 | 02 | 2012 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $17,363 | $0 | Not Implemented |
SF0420 # 01 Y:2012 | 01 | 2012 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $113,599 | $0 | Not Implemented |
SF0420 # 04 Y:2012 | 04 | 2012 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $44,796 | $12,500 | Not Implemented |
SF0420 # 09 Y:2012 | 09 | 2012 | BURN A LESS EXPENSIVE GRADE OF FUEL | $52,423 | $78,900 | Not Implemented |
SF0420 # 06 Y:2012 | 06 | 2012 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $2,415 | $2,286 | Not Implemented |
SF0420 # 05 Y:2012 | 05 | 2012 | INSTALL / REPAIR INSULATION ON STEAM LINES | $936 | $555 | Implemented |
SF0420 # 03 Y:2012 | 03 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,156 | $840 | Implemented |
SF0420 # 13 Y:2012 | 13 | 2012 | MINIMIZE WATER USAGE | $677 | $0 | Not Implemented |
SF0420 # 08 Y:2012 | 08 | 2012 | INSTALL OCCUPANCY SENSORS | $53,028 | $57,435 | Not Implemented |
SF0420 # 07 Y:2012 | 07 | 2012 | INCREASE AMOUNT OF CONDENSATE RETURNED | $13,612 | $13,418 | Not Implemented |
SF0420 # 10 Y:2012 | 10 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,461 | $9,543 | Not Implemented |
SF0420 # 12 Y:2012 | 12 | 2012 | MINIMIZE WATER USAGE | $5,598 | $0 | Not Implemented |
SF0420 # 11 Y:2012 | 11 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $147,442 | $498,340 | Not Implemented |
SF0419 # 04 Y:2012 | 04 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,431 | $16,162 | Implemented |
SF0419 # 05 Y:2012 | 05 | 2012 | INSTALL AUTOMATIC BOILER FUEL FEED SYSTEM | $8,615 | $42,287 | Not Implemented |
SF0419 # 03 Y:2012 | 03 | 2012 | USE COLD WASTE WATER TO COOL CHILLER FEED WATER | $1,176 | $963 | Not Implemented |
SF0419 # 06 Y:2012 | 06 | 2012 | HEAT WATER WITH EXHAUST HEAT | $5,628 | $35,328 | Not Implemented |
SF0419 # 01 Y:2012 | 01 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $637 | $80 | Implemented |
SF0419 # 02 Y:2012 | 02 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,754 | $2,287 | Not Implemented |
SF0417 # 02 Y:2012 | 02 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,459 | $0 | Implemented |