IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

222

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0284 # 04 Y:2004 04 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,933 $12,763 Implemented
SF0284 # 05 Y:2004 05 2004 INSULATE BARE EQUIPMENT $5,065 $3,065 Not Implemented
SF0284 # 06 Y:2004 06 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,841 $8,312 Not Implemented
SF0284 # 07 Y:2004 07 2004 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $39,674 $43,664 Not Implemented
SF0284 # 08 Y:2004 08 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,661 $1,900 Not Implemented
SF0284 # 09 Y:2004 09 2004 INSTALL OCCUPANCY SENSORS $554 $1,152 Not Implemented
SF0284 # 10 Y:2004 10 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $15,103 $50,000 Not Implemented
SF0284 # 11 Y:2004 11 2004 ELIMINATE LEAKS IN WATER LINES AND VALVES $13,300 $3,000 Implemented
SF0283 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,759 $0 Implemented
SF0283 # 02 Y:2004 02 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,304 $0 Not Implemented
SF0283 # 03 Y:2004 03 2004 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,636 $829 Implemented
SF0283 # 04 Y:2004 04 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $33,377 $31,490 Implemented
SF0283 # 05 Y:2004 05 2004 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $61,990 $40,000 Implemented
SF0283 # 06 Y:2004 06 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $19,808 $20,000 Not Implemented
SF0283 # 07 Y:2004 07 2004 INSULATE BARE EQUIPMENT $1,284 $1,218 Implemented
SF0283 # 08 Y:2004 08 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,669 $10,828 Implemented
SF0283 # 09 Y:2004 09 2004 INSTALL OCCUPANCY SENSORS $1,066 $2,688 Implemented
SF0283 # 10 Y:2004 10 2004 USE AN AUTOMATIC PLATE PROCESSOR $27,300 $40,500 Implemented
SF0283 # 11 Y:2004 11 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $227,033 $40,600 Not Implemented
SF0282 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,198 $0 Implemented
SF0282 # 02 Y:2004 02 2004 INSTALL STEAM TRAP $1,304 $299 Implemented
SF0282 # 03 Y:2004 03 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,053 $2,417 Implemented
SF0282 # 04 Y:2004 04 2004 INSTALL OCCUPANCY SENSORS $2,015 $1,440 Not Implemented
SF0282 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,516 $14,960 Not Implemented
SF0282 # 06 Y:2004 06 2004 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $272 $571 Not Implemented