IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

755

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ST0030 # 05 Y:1985 05 1985 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $833 $1,080 Not Implemented
ST0030 # 06 Y:1985 06 1985 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,090 $83 Implemented
ST0030 # 07 Y:1985 07 1985 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $5,609 $0 Implemented
ST0030 # 08 Y:1985 08 1985 INSULATE BARE EQUIPMENT $1,395 $3,038 Not Implemented
ST0031 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,995 $1,070 Implemented
ST0031 # 02 Y:1985 02 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $201 $75 Implemented
ST0031 # 03 Y:1985 03 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,132 $116 Implemented
ST0031 # 04 Y:1985 04 1985 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,348 $1,900 Not Implemented
ST0031 # 05 Y:1985 05 1985 RECOVER WASTE HEAT FROM EQUIPMENT $610 $1,500 Not Implemented
ST0031 # 06 Y:1985 06 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,311 $537 Not Implemented
ST0031 # 07 Y:1985 07 1985 INSULATE BARE EQUIPMENT $428 $110 Implemented
ST0031 # 08 Y:1985 08 1985 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,500 $2,400 Not Implemented
ST0031 # 09 Y:1985 09 1985 AIR CONDITION ONLY SPACE NECESSARY $537 $300 Not Implemented
ST0031 # 10 Y:1985 10 1985 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,813 $1,255 Implemented
ST0031 # 11 Y:1985 11 1985 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $20,807 $12,000 Not Implemented
ST0032 # 01 Y:1985 01 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $514 $64 Implemented
ST0032 # 02 Y:1985 02 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $72 $42 Not Implemented
ST0032 # 03 Y:1985 03 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,640 $688 Not Implemented
ST0032 # 04 Y:1985 04 1985 USE DEMAND CONTROLLER OR LOAD SHEDDER $890 $1,900 Implemented
ST0032 # 05 Y:1985 05 1985 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $1,974 $900 Not Implemented
ST0032 # 06 Y:1985 06 1985 REPLACE DC EQUIPMENT WITH AC EQUIPMENT $2,416 $5,000 Not Implemented
ST0032 # 07 Y:1985 07 1985 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $305 $0 Not Implemented
ST0032 # 08 Y:1985 08 1985 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $380 $1,140 Not Implemented
ST0032 # 09 Y:1985 09 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $503 $380 Not Implemented
ST0033 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,091 $340 Not Implemented