IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,612

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0133 # 01 Y:2002 01 2002 CHECK FOR ACCURACY OF UTILITY / POWER METERS $482 $0 Not Implemented
SU0133 # 02 Y:2002 02 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,025 $0 Implemented
SU0133 # 03 Y:2002 03 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $339 $115 Implemented
SU0133 # 04 Y:2002 04 2002 REPAIR AND ELIMINATE STEAM LEAKS $675 $87 Implemented
SU0133 # 05 Y:2002 05 2002 INSULATE BARE EQUIPMENT $754 $322 Implemented
SU0133 # 06 Y:2002 06 2002 INSULATE BARE EQUIPMENT $1,110 $264 Implemented
SU0133 # 07 Y:2002 07 2002 INSULATE BARE EQUIPMENT $2,774 $495 Implemented
SU0133 # 08 Y:2002 08 2002 INSTALL OCCUPANCY SENSORS $123 $60 Implemented
SU0133 # 09 Y:2002 09 2002 RECOVER WASTE HEAT FROM EQUIPMENT $314 $460 Not Implemented
SU0133 # 10 Y:2002 10 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $14 $0 Implemented
SU0133 # 11 Y:2002 11 2002 $3,402 $13,000 Not Implemented
SU0133 # 12 Y:2002 12 2002 $5,870 $4,230 Not Implemented
SU0130 # 01 Y:2002 01 2002 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $217 $518 Implemented
SU0130 # 02 Y:2002 02 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $307 $38 Implemented
SU0130 # 03 Y:2002 03 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $442 $871 Not Implemented
SU0130 # 04 Y:2002 04 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,614 $1,875 Not Implemented
SU0130 # 05 Y:2002 05 2002 $33,055 $2,330 Not Implemented
SU0130 # 06 Y:2002 06 2002 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT $109,460 $1,150,000 Not Implemented
SU0131 # 01 Y:2002 01 2002 CHANGE PRODUCT SPECS $14,930 $2,500 Not Implemented
SU0131 # 02 Y:2002 02 2002 ELIMINATE/REDUCE AN OPERATION $2,391 $115 Not Implemented
SU0131 # 03 Y:2002 03 2002 RECOVER WASTE HEAT FROM EQUIPMENT $997 $102 Implemented
SU0131 # 04 Y:2002 04 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $917 $115 Not Implemented
SU0131 # 05 Y:2002 05 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $775 $193 Implemented
SU0131 # 06 Y:2002 06 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $197 $0 Not Implemented
SU0129 # 01 Y:2002 01 2002 BURN WOOD BY-PRODUCTS FOR HEAT $5,442 $1,172 Not Implemented