IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,612

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0106 # 01 Y:2001 01 2001 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $10,051 $0 Implemented
SU0106 # 02 Y:2001 02 2001 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $399,407 $1,400,000 Not Implemented
SU0106 # 03 Y:2001 03 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,947 $2,241 Not Implemented
SU0106 # 04 Y:2001 04 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,158 $500 Implemented
SU0106 # 05 Y:2001 05 2001 OPTIMIZE PLANT POWER FACTOR $3,243 $10,210 Implemented
SU0110 # 01 Y:2001 01 2001 COMBINE UTILITY METERS $5,085 $0 Not Implemented
SU0110 # 02 Y:2001 02 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $13,180 $2,241 Not Implemented
SU0110 # 03 Y:2001 03 2001 MINIMIZE WATER USAGE $51,680 $1,605 Not Implemented
SU0110 # 04 Y:2001 04 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,023 $90 Not Implemented
SU0110 # 05 Y:2001 05 2001 DISCONNECT BALLASTS $65 $0 Not Implemented
SU0110 # 06 Y:2001 06 2001 OPTIMIZE PLANT POWER FACTOR $1,526 $3,780 Not Implemented
SU0116 # 01 Y:2001 01 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $200 $0 Not Implemented
SU0116 # 02 Y:2001 02 2001 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $18,236 $114,000 Not Implemented
SU0116 # 03 Y:2001 03 2001 INSULATE BARE EQUIPMENT $7,323 $979 Implemented
SU0116 # 04 Y:2001 04 2001 OPTIMIZE PLANT POWER FACTOR $5,330 $16,000 Not Implemented
SU0116 # 05 Y:2001 05 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $418 $100 Implemented
SU0116 # 06 Y:2001 06 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $329 $0 Not Implemented
SU0116 # 07 Y:2001 07 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $503 $0 Implemented
SU0115 # 01 Y:2001 01 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $3,222 $0 Implemented
SU0115 # 02 Y:2001 02 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,645 $225 Implemented
SU0115 # 03 Y:2001 03 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,834 $0 Not Implemented
SU0115 # 04 Y:2001 04 2001 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $64,282 $500,000 Not Implemented
SU0115 # 05 Y:2001 05 2001 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT $81,279 $750,000 Not Implemented
SU0115 # 06 Y:2001 06 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $80 $0 Implemented
SU0115 # 07 Y:2001 07 2001 INSTALL / REPAIR INSULATION ON STEAM LINES $6,188 $8,325 Implemented