Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,950
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TN0696 # 04 Y:2000 | 04 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $68,153 | $6,800 | Implemented |
TN0696 # 03 Y:2000 | 03 | 2000 | MODIFY CURRENT INCENTIVE PROGRAM | $78,500 | $16,450 | Not Implemented |
TN0696 # 02 Y:2000 | 02 | 2000 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $182,800 | $173,400 | Not Implemented |
TN0696 # 01 Y:2000 | 01 | 2000 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $184,000 | $44,000 | Implemented |
TN0696 # 05 Y:2000 | 05 | 2000 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $50,500 | $0 | Not Implemented |
TN0696 # 06 Y:2000 | 06 | 2000 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $35,400 | $18,900 | Implemented |
TN0696 # 08 Y:2000 | 08 | 2000 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $33,720 | $5,075 | Implemented |
TN0696 # 07 Y:2000 | 07 | 2000 | ISOLATE STEAM LINES TO AVOID HEATING AIR CONDITIONED AREAS | $31,500 | $0 | Not Implemented |
TN0695 # 05 Y:2000 | 05 | 2000 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $26,200 | $18,500 | n/a |
TN0695 # 01 Y:2000 | 01 | 2000 | MODIFY CURRENT INCENTIVE PROGRAM | $80,000 | $16,690 | n/a |
TN0695 # 02 Y:2000 | 02 | 2000 | SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE | $52,800 | $320 | n/a |
TN0695 # 11 Y:2000 | 11 | 2000 | INSTALL TIMERS AND/OR THERMOSTATS | $2,160 | $2,820 | n/a |
TN0695 # 07 Y:2000 | 07 | 2000 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $15,015 | $21,850 | n/a |
TN0695 # 04 Y:2000 | 04 | 2000 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $28,960 | $52,400 | n/a |
TN0695 # 09 Y:2000 | 09 | 2000 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,800 | $5,510 | n/a |
TN0695 # 08 Y:2000 | 08 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,245 | $0 | n/a |
TN0695 # 06 Y:2000 | 06 | 2000 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $20,730 | $1,175 | n/a |
TN0695 # 03 Y:2000 | 03 | 2000 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $50,645 | $5,075 | n/a |
TN0695 # 10 Y:2000 | 10 | 2000 | INSTALL SPECTRAL REFLECTORS / DELAMP | $2,880 | $1,850 | n/a |
TN0694 # 05 Y:2000 | 05 | 2000 | OPTIMIZE PLANT POWER FACTOR | $8,665 | $26,260 | Not Implemented |
TN0694 # 03 Y:2000 | 03 | 2000 | DEVELOP A REPAIR/REPLACE POLICY | $10,755 | $5,075 | Implemented |
TN0694 # 01 Y:2000 | 01 | 2000 | INITIATE A PROGRAM TO ACQUIRE ISO CERTIFICATION | $219,860 | $100,000 | Not Implemented |
TN0694 # 06 Y:2000 | 06 | 2000 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $6,210 | $18,900 | Not Implemented |
TN0694 # 11 Y:2000 | 11 | 2000 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,365 | $0 | Implemented |
TN0694 # 04 Y:2000 | 04 | 2000 | REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF | $10,130 | $181,580 | Not Implemented |