IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,946

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0597 # 01 Y:1997 01 1997 RESCHEDULE BREAKS TO ALLOW FOR CONTINUOUS PRODUCTION $420,000 $0 Implemented
TN0597 # 03 Y:1997 03 1997 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $10,210 $0 Implemented
TN0597 # 04 Y:1997 04 1997 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $4,865 $0 Implemented
TN0597 # 06 Y:1997 06 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,710 $2,000 Implemented
TN0597 # 07 Y:1997 07 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,180 $800 Implemented
TN0597 # 08 Y:1997 08 1997 INSTALL TIMERS AND/OR THERMOSTATS $1,830 $0 Implemented
TN0597 # 09 Y:1997 09 1997 MODIFY MATERIAL APPLICATION METHODS $1,560 $4,400 Implemented
TN0597 # 10 Y:1997 10 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $640 $460 Implemented
TN0586 # 02 Y:1996 02 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $39,080 $7,880 Implemented
TN0586 # 09 Y:1996 09 1996 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $4,410 $0 Implemented
TN0596 # 02 Y:1996 02 1996 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $80,150 $1,130 Implemented
TN0596 # 05 Y:1996 05 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,870 $4,200 Implemented
TN0596 # 06 Y:1996 06 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,170 $7,000 Implemented
TN0596 # 07 Y:1996 07 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $580 $410 Implemented
TN0595 # 01 Y:1996 01 1996 INSTALL TIMERS AND/OR THERMOSTATS $34,060 $12,880 Implemented
TN0595 # 03 Y:1996 03 1996 INSULATE BARE EQUIPMENT $9,770 $5,400 Implemented
TN0595 # 04 Y:1996 04 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,230 $7,525 Implemented
TN0595 # 07 Y:1996 07 1996 IMPROVED MATERIAL HANDLING (MIXING AND TRANSFER) $2,600 $0 Implemented
TN0593 # 02 Y:1996 02 1996 UPGRADE CONVEYORS $30,420 $14,000 Implemented
TN0593 # 05 Y:1996 05 1996 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,668 $0 Implemented
TN0593 # 06 Y:1996 06 1996 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $1,506 $0 Implemented
TN0592 # 04 Y:1996 04 1996 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $2,820 $5,440 Implemented
TN0592 # 05 Y:1996 05 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,505 $0 Implemented
TN0591 # 01 Y:1996 01 1996 INSTALL SPECTRAL REFLECTORS / DELAMP $7,095 $21,300 Implemented
TN0591 # 04 Y:1996 04 1996 RECOVER WASTE HEAT FROM EQUIPMENT $777 $2,520 Implemented