Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
135
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TN0687 # 10 Y:2000 | 10 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $720 | $0 | Implemented |
TN0687 # 06 Y:2000 | 06 | 2000 | INSTALL TIMERS AND/OR THERMOSTATS | $2,289 | $2,150 | Implemented |
TN0687 # 01 Y:2000 | 01 | 2000 | INSTALL REDUNDANT EQUIPMENT TO AVOID LOSSES CAUSED BY EQUIPMENT FAILURE AND ROUTINE MAINTENANCE | $25,255 | $1,075 | Implemented |
TN0687 # 02 Y:2000 | 02 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,703 | $750 | Implemented |
TN0687 # 07 Y:2000 | 07 | 2000 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,680 | $350 | Implemented |
TN0687 # 04 Y:2000 | 04 | 2000 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $4,210 | $820 | Implemented |
TN0666 # 11 Y:1999 | 11 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $560 | $1,200 | Implemented |
TN0666 # 02 Y:1999 | 02 | 1999 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $18,800 | $16,000 | Implemented |
TN0666 # 05 Y:1999 | 05 | 1999 | INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE | $5,902 | $5,705 | Implemented |
TN0666 # 06 Y:1999 | 06 | 1999 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $3,640 | $4,620 | Implemented |
TN0666 # 03 Y:1999 | 03 | 1999 | INSTALL TIMERS AND/OR THERMOSTATS | $12,160 | $3,250 | Implemented |
TN0666 # 09 Y:1999 | 09 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,120 | $1,460 | Implemented |
TN0666 # 10 Y:1999 | 10 | 1999 | USE SYNTHETIC LUBRICANT | $900 | $0 | Implemented |
TN0666 # 08 Y:1999 | 08 | 1999 | INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE | $1,433 | $800 | Implemented |
TN0667 # 03 Y:1999 | 03 | 1999 | METER WASTE WATER | $26,280 | $2,980 | Implemented |
TN0667 # 02 Y:1999 | 02 | 1999 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $52,782 | $80,100 | Implemented |
TN0645 # 10 Y:1998 | 10 | 1998 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $9,390 | $8,000 | Implemented |
TN0645 # 01 Y:1998 | 01 | 1998 | ALLOW DRAINAGE BEFORE WITHDRAWING OBJECT | $408,630 | $24,685 | Implemented |
TN0645 # 11 Y:1998 | 11 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,880 | $5,000 | Implemented |
TN0636 # 06 Y:1998 | 06 | 1998 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $150 | $600 | Implemented |
TN0636 # 05 Y:1998 | 05 | 1998 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $175 | $0 | Implemented |
TN0636 # 03 Y:1998 | 03 | 1998 | INSULATE BARE EQUIPMENT | $670 | $220 | Implemented |
TN0625 # 05 Y:1998 | 05 | 1998 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,380 | $6,370 | Implemented |
TN0625 # 04 Y:1998 | 04 | 1998 | SWITCH TO A SOLVENT THAT CAN BE CLEANED AND RE-USED | $9,965 | $5,000 | Implemented |
TN0625 # 06 Y:1998 | 06 | 1998 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $900 | $0 | Implemented |