IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

398

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0694 # 04 Y:2000 04 2000 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $10,130 $181,580 Not Implemented
TN0694 # 03 Y:2000 03 2000 DEVELOP A REPAIR/REPLACE POLICY $10,755 $5,075 Implemented
TN0694 # 10 Y:2000 10 2000 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $2,185 $3,570 Not Implemented
TN0694 # 08 Y:2000 08 2000 DISTILL CONTAMINATED SOLVENTS FOR REUSE $3,600 $7,000 Not Implemented
TN0694 # 02 Y:2000 02 2000 ADD AREA LIGHTING SWITCHES $17,510 $25,030 Implemented
TN0694 # 06 Y:2000 06 2000 USE DEMAND CONTROLLER OR LOAD SHEDDER $6,210 $18,900 Not Implemented
TN0694 # 07 Y:2000 07 2000 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $4,345 $9,100 Not Implemented
TN0694 # 01 Y:2000 01 2000 INITIATE A PROGRAM TO ACQUIRE ISO CERTIFICATION $219,860 $100,000 Not Implemented
TN0694 # 05 Y:2000 05 2000 OPTIMIZE PLANT POWER FACTOR $8,665 $26,260 Not Implemented
TN0694 # 11 Y:2000 11 2000 TURN OFF EQUIPMENT WHEN NOT IN USE $1,365 $0 Implemented
TN0694 # 09 Y:2000 09 2000 INSTALL SPECTRAL REFLECTORS / DELAMP $2,795 $1,875 Not Implemented
TN0692 # 02 Y:2000 02 2000 ADD ADDITIONAL PRODUCTION SHIFT $899,000 $967,000 Implemented
TN0692 # 08 Y:2000 08 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,336 $0 Implemented
TN0692 # 04 Y:2000 04 2000 USE DEMAND CONTROLLER OR LOAD SHEDDER $7,220 $11,900 Not Implemented
TN0692 # 03 Y:2000 03 2000 RECOVER WASTE HEAT FROM EQUIPMENT $10,500 $700 Not Implemented
TN0692 # 06 Y:2000 06 2000 TURN OFF EQUIPMENT WHEN NOT IN USE $3,650 $0 Implemented
TN0692 # 07 Y:2000 07 2000 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,600 $900 Implemented
TN0692 # 01 Y:2000 01 2000 RESCHEDULE BREAKS TO ALLOW FOR CONTINUOUS PRODUCTION $3,613,000 $645,000 Not Implemented
TN0692 # 05 Y:2000 05 2000 RECOVER AND REUSE WASTE MATERIAL $4,210 $0 Implemented
TN0692 # 09 Y:2000 09 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,115 $1,300 Implemented
TN0678 # 03 Y:2000 03 2000 INCREASE USE OF AUTOMATION $32,000 $52,200 Not Implemented
TN0678 # 01 Y:2000 01 2000 ELIMINATE THIRD SHIFT $487,140 $47,600 Not Implemented
TN0678 # 05 Y:2000 05 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,470 $695 Implemented
TN0678 # 04 Y:2000 04 2000 INSTALL SPECTRAL REFLECTORS / DELAMP $12,340 $8,780 Not Implemented
TN0678 # 08 Y:2000 08 2000 REDUCE EXCESS STEAM BLEEDING $350 $170 Implemented