ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TN0694 # 04 Y:2000 | 04 | 2000 | REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF | $10,130 | $181,580 | Not Implemented |
TN0694 # 03 Y:2000 | 03 | 2000 | DEVELOP A REPAIR/REPLACE POLICY | $10,755 | $5,075 | Implemented |
TN0694 # 10 Y:2000 | 10 | 2000 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $2,185 | $3,570 | Not Implemented |
TN0694 # 08 Y:2000 | 08 | 2000 | DISTILL CONTAMINATED SOLVENTS FOR REUSE | $3,600 | $7,000 | Not Implemented |
TN0694 # 02 Y:2000 | 02 | 2000 | ADD AREA LIGHTING SWITCHES | $17,510 | $25,030 | Implemented |
TN0694 # 06 Y:2000 | 06 | 2000 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $6,210 | $18,900 | Not Implemented |
TN0694 # 07 Y:2000 | 07 | 2000 | USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME | $4,345 | $9,100 | Not Implemented |
TN0694 # 01 Y:2000 | 01 | 2000 | INITIATE A PROGRAM TO ACQUIRE ISO CERTIFICATION | $219,860 | $100,000 | Not Implemented |
TN0694 # 05 Y:2000 | 05 | 2000 | OPTIMIZE PLANT POWER FACTOR | $8,665 | $26,260 | Not Implemented |
TN0694 # 11 Y:2000 | 11 | 2000 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,365 | $0 | Implemented |
TN0694 # 09 Y:2000 | 09 | 2000 | INSTALL SPECTRAL REFLECTORS / DELAMP | $2,795 | $1,875 | Not Implemented |
TN0692 # 02 Y:2000 | 02 | 2000 | ADD ADDITIONAL PRODUCTION SHIFT | $899,000 | $967,000 | Implemented |
TN0692 # 08 Y:2000 | 08 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,336 | $0 | Implemented |
TN0692 # 04 Y:2000 | 04 | 2000 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $7,220 | $11,900 | Not Implemented |
TN0692 # 03 Y:2000 | 03 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $10,500 | $700 | Not Implemented |
TN0692 # 06 Y:2000 | 06 | 2000 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,650 | $0 | Implemented |
TN0692 # 07 Y:2000 | 07 | 2000 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,600 | $900 | Implemented |
TN0692 # 01 Y:2000 | 01 | 2000 | RESCHEDULE BREAKS TO ALLOW FOR CONTINUOUS PRODUCTION | $3,613,000 | $645,000 | Not Implemented |
TN0692 # 05 Y:2000 | 05 | 2000 | RECOVER AND REUSE WASTE MATERIAL | $4,210 | $0 | Implemented |
TN0692 # 09 Y:2000 | 09 | 2000 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,115 | $1,300 | Implemented |
TN0678 # 03 Y:2000 | 03 | 2000 | INCREASE USE OF AUTOMATION | $32,000 | $52,200 | Not Implemented |
TN0678 # 01 Y:2000 | 01 | 2000 | ELIMINATE THIRD SHIFT | $487,140 | $47,600 | Not Implemented |
TN0678 # 05 Y:2000 | 05 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,470 | $695 | Implemented |
TN0678 # 04 Y:2000 | 04 | 2000 | INSTALL SPECTRAL REFLECTORS / DELAMP | $12,340 | $8,780 | Not Implemented |
TN0678 # 08 Y:2000 | 08 | 2000 | REDUCE EXCESS STEAM BLEEDING | $350 | $170 | Implemented |