IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,950

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0645 # 03 Y:1998 03 1998 REDUCE SOLUTION DRAG-OUT TO PREVENT SOLUTION LOSS $237,600 $153,485 Not Implemented
TN0645 # 04 Y:1998 04 1998 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $221,455 $70,000 Not Implemented
TN0645 # 05 Y:1998 05 1998 INITIATE A PROGRAM TO ACQUIRE ISO CERTIFICATION $198,225 $250,000 Not Implemented
TN0645 # 06 Y:1998 06 1998 USE A DIFFERENT OR RECYCLED RAW MATERIAL $51,945 $200,000 Not Implemented
TN0645 # 07 Y:1998 07 1998 USE DEIONIZED WATER IN UPSTREAM RINSE TANKS $48,650 $120,000 Not Implemented
TN0645 # 08 Y:1998 08 1998 TREAT AND REUSE RINSE WATERS $28,105 $69,200 Not Implemented
TN0645 # 09 Y:1998 09 1998 INSTALL SET-BACK TIMERS $15,755 $1,555 Not Implemented
TN0645 # 10 Y:1998 10 1998 ELIMINATE LEAKS IN WATER LINES AND VALVES $9,390 $8,000 Implemented
TN0645 # 11 Y:1998 11 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,880 $5,000 Implemented
TN0645 # 12 Y:1998 12 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,310 $1,120 Not Implemented
TN0645 # 13 Y:1998 13 1998 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $2,780 $14,300 Not Implemented
TN0646 # 01 Y:1998 01 1998 REPROCESS SPENT OILS ON SITE FOR RE-USE $603,410 $51,350 Implemented
TN0646 # 02 Y:1998 02 1998 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $28,800 $21,900 Implemented
TN0646 # 03 Y:1998 03 1998 ADD AREA LIGHTING SWITCHES $8,900 $13,600 Implemented
TN0646 # 04 Y:1998 04 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,325 $5,000 Implemented
TN0646 # 05 Y:1998 05 1998 CONTRACT A WOOD PALLET RECYCLING COMPANY $2,880 $0 Implemented
TN0646 # 06 Y:1998 06 1998 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,600 $0 Not Implemented
TN0644 # 01 Y:1998 01 1998 AVOID CONTAMINATION OF END PIECES AND REUSE AS FEED STOCK $363,750 $20,000 Not Implemented
TN0644 # 02 Y:1998 02 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $32,370 $50,000 Implemented
TN0644 # 03 Y:1998 03 1998 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $17,850 $32,200 Implemented
TN0644 # 04 Y:1998 04 1998 OPTIMIZE PLANT POWER FACTOR $11,910 $1,440 Not Implemented
TN0644 # 05 Y:1998 05 1998 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $7,575 $8,575 Not Implemented
TN0644 # 06 Y:1998 06 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,180 $2,030 Implemented
TN0644 # 07 Y:1998 07 1998 INSULATE BARE EQUIPMENT $2,850 $1,100 Not Implemented
TN0643 # 01 Y:1998 01 1998 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $219,500 $24,000 Implemented