IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,950

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0568 # 04 Y:1996 04 1996 RECOVER WASTE HEAT FROM EQUIPMENT $2,810 $11,100 Not Implemented
TN0568 # 05 Y:1996 05 1996 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,810 $8,400 Not Implemented
TN0568 # 06 Y:1996 06 1996 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,739 $5,200 Not Implemented
TN0568 # 07 Y:1996 07 1996 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $277 $0 Not Implemented
TN0567 # 01 Y:1996 01 1996 MAKE A NEW BY-PRODUCT $3,153,280 $5,059,000 n/a
TN0567 # 02 Y:1996 02 1996 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $772,731 $2,866,500 n/a
TN0567 # 03 Y:1996 03 1996 MAKE A NEW BY-PRODUCT $329,700 $7,300 n/a
TN0567 # 04 Y:1996 04 1996 COVER OPEN TANKS $19,440 $25,100 n/a
TN0567 # 05 Y:1996 05 1996 OPTIMIZE PLANT POWER FACTOR $10,799 $27,000 n/a
TN0567 # 06 Y:1996 06 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $9,760 $3,885 n/a
TN0556 # 01 Y:1995 01 1995 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,874 $7,950 Not Implemented
TN0556 # 02 Y:1995 02 1995 INSTALL SPECTRAL REFLECTORS / DELAMP $4,587 $18,500 Not Implemented
TN0556 # 03 Y:1995 03 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $660 $1,240 Not Implemented
TN0556 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $374 $38 Implemented
TN0556 # 05 Y:1995 05 1995 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,298 $0 Not Implemented
TN0556 # 06 Y:1995 06 1995 MODIFY MATERIAL APPLICATION METHODS $205,755 $81,770 Implemented
TN0555 # 01 Y:1995 01 1995 INSTALL TIMERS AND/OR THERMOSTATS $3,355 $2,320 Implemented
TN0555 # 02 Y:1995 02 1995 RECOVER WASTE HEAT FROM EQUIPMENT $805 $2,200 Implemented
TN0555 # 03 Y:1995 03 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,689 $0 Implemented
TN0555 # 04 Y:1995 04 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $818 $620 Implemented
TN0555 # 05 Y:1995 05 1995 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $229 $385 Not Implemented
TN0555 # 06 Y:1995 06 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $349 $490 Implemented
TN0555 # 07 Y:1995 07 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $323 $435 Implemented
TN0555 # 08 Y:1995 08 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $586 $442 Implemented
TN0555 # 09 Y:1995 09 1995 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $2,409 $0 Implemented