Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
398
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TN0694 # 04 Y:2000 | 04 | 2000 | REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF | $10,130 | $181,580 | Not Implemented |
TN0694 # 03 Y:2000 | 03 | 2000 | DEVELOP A REPAIR/REPLACE POLICY | $10,755 | $5,075 | Implemented |
TN0694 # 10 Y:2000 | 10 | 2000 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $2,185 | $3,570 | Not Implemented |
TN0694 # 08 Y:2000 | 08 | 2000 | DISTILL CONTAMINATED SOLVENTS FOR REUSE | $3,600 | $7,000 | Not Implemented |
TN0694 # 02 Y:2000 | 02 | 2000 | ADD AREA LIGHTING SWITCHES | $17,510 | $25,030 | Implemented |
TN0694 # 06 Y:2000 | 06 | 2000 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $6,210 | $18,900 | Not Implemented |
TN0694 # 07 Y:2000 | 07 | 2000 | USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME | $4,345 | $9,100 | Not Implemented |
TN0694 # 01 Y:2000 | 01 | 2000 | INITIATE A PROGRAM TO ACQUIRE ISO CERTIFICATION | $219,860 | $100,000 | Not Implemented |
TN0694 # 05 Y:2000 | 05 | 2000 | OPTIMIZE PLANT POWER FACTOR | $8,665 | $26,260 | Not Implemented |
TN0694 # 11 Y:2000 | 11 | 2000 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,365 | $0 | Implemented |
TN0694 # 09 Y:2000 | 09 | 2000 | INSTALL SPECTRAL REFLECTORS / DELAMP | $2,795 | $1,875 | Not Implemented |
TN0692 # 02 Y:2000 | 02 | 2000 | ADD ADDITIONAL PRODUCTION SHIFT | $899,000 | $967,000 | Implemented |
TN0692 # 08 Y:2000 | 08 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,336 | $0 | Implemented |
TN0692 # 04 Y:2000 | 04 | 2000 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $7,220 | $11,900 | Not Implemented |
TN0692 # 03 Y:2000 | 03 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $10,500 | $700 | Not Implemented |
TN0692 # 06 Y:2000 | 06 | 2000 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,650 | $0 | Implemented |
TN0692 # 07 Y:2000 | 07 | 2000 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,600 | $900 | Implemented |
TN0692 # 01 Y:2000 | 01 | 2000 | RESCHEDULE BREAKS TO ALLOW FOR CONTINUOUS PRODUCTION | $3,613,000 | $645,000 | Not Implemented |
TN0692 # 05 Y:2000 | 05 | 2000 | RECOVER AND REUSE WASTE MATERIAL | $4,210 | $0 | Implemented |
TN0692 # 09 Y:2000 | 09 | 2000 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,115 | $1,300 | Implemented |
TN0678 # 03 Y:2000 | 03 | 2000 | INCREASE USE OF AUTOMATION | $32,000 | $52,200 | Not Implemented |
TN0678 # 01 Y:2000 | 01 | 2000 | ELIMINATE THIRD SHIFT | $487,140 | $47,600 | Not Implemented |
TN0678 # 05 Y:2000 | 05 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,470 | $695 | Implemented |
TN0678 # 04 Y:2000 | 04 | 2000 | INSTALL SPECTRAL REFLECTORS / DELAMP | $12,340 | $8,780 | Not Implemented |
TN0678 # 08 Y:2000 | 08 | 2000 | REDUCE EXCESS STEAM BLEEDING | $350 | $170 | Implemented |