Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,644
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TN0696 # 08 Y:2000 | 08 | 2000 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $33,720 | $5,075 | Implemented |
TN0696 # 02 Y:2000 | 02 | 2000 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $182,800 | $173,400 | Not Implemented |
TN0696 # 01 Y:2000 | 01 | 2000 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $184,000 | $44,000 | Implemented |
TN0696 # 04 Y:2000 | 04 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $68,153 | $6,800 | Implemented |
TN0696 # 07 Y:2000 | 07 | 2000 | ISOLATE STEAM LINES TO AVOID HEATING AIR CONDITIONED AREAS | $31,500 | $0 | Not Implemented |
TN0696 # 03 Y:2000 | 03 | 2000 | MODIFY CURRENT INCENTIVE PROGRAM | $78,500 | $16,450 | Not Implemented |
TN0696 # 06 Y:2000 | 06 | 2000 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $35,400 | $18,900 | Implemented |
TN0696 # 05 Y:2000 | 05 | 2000 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $50,500 | $0 | Not Implemented |
TN0695 # 02 Y:2000 | 02 | 2000 | SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE | $52,800 | $320 | n/a |
TN0695 # 06 Y:2000 | 06 | 2000 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $20,730 | $1,175 | n/a |
TN0695 # 04 Y:2000 | 04 | 2000 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $28,960 | $52,400 | n/a |
TN0695 # 05 Y:2000 | 05 | 2000 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $26,200 | $18,500 | n/a |
TN0695 # 09 Y:2000 | 09 | 2000 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,800 | $5,510 | n/a |
TN0695 # 08 Y:2000 | 08 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,245 | $0 | n/a |
TN0695 # 07 Y:2000 | 07 | 2000 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $15,015 | $21,850 | n/a |
TN0695 # 01 Y:2000 | 01 | 2000 | MODIFY CURRENT INCENTIVE PROGRAM | $80,000 | $16,690 | n/a |
TN0695 # 10 Y:2000 | 10 | 2000 | INSTALL SPECTRAL REFLECTORS / DELAMP | $2,880 | $1,850 | n/a |
TN0695 # 03 Y:2000 | 03 | 2000 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $50,645 | $5,075 | n/a |
TN0695 # 11 Y:2000 | 11 | 2000 | INSTALL TIMERS AND/OR THERMOSTATS | $2,160 | $2,820 | n/a |
TN0693 # 03 Y:2000 | 03 | 2000 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $22,100 | $8,120 | Implemented |
TN0693 # 07 Y:2000 | 07 | 2000 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,503 | $900 | Not Implemented |
TN0693 # 04 Y:2000 | 04 | 2000 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $12,000 | $35,070 | Implemented |
TN0693 # 08 Y:2000 | 08 | 2000 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,357 | $490 | Implemented |
TN0693 # 05 Y:2000 | 05 | 2000 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $11,176 | $379 | Not Implemented |
TN0693 # 06 Y:2000 | 06 | 2000 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $8,508 | $18,900 | Not Implemented |