Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
181
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TN0645 # 06 Y:1998 | 06 | 1998 | USE A DIFFERENT OR RECYCLED RAW MATERIAL | $51,945 | $200,000 | Not Implemented |
TN0645 # 04 Y:1998 | 04 | 1998 | SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE | $221,455 | $70,000 | Not Implemented |
TN0645 # 01 Y:1998 | 01 | 1998 | ALLOW DRAINAGE BEFORE WITHDRAWING OBJECT | $408,630 | $24,685 | Implemented |
TN0645 # 13 Y:1998 | 13 | 1998 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $2,780 | $14,300 | Not Implemented |
TN0645 # 08 Y:1998 | 08 | 1998 | TREAT AND REUSE RINSE WATERS | $28,105 | $69,200 | Not Implemented |
TN0645 # 11 Y:1998 | 11 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,880 | $5,000 | Implemented |
TN0645 # 07 Y:1998 | 07 | 1998 | USE DEIONIZED WATER IN UPSTREAM RINSE TANKS | $48,650 | $120,000 | Not Implemented |
TN0645 # 02 Y:1998 | 02 | 1998 | RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER | $277,345 | $644,800 | Not Implemented |
TN0645 # 05 Y:1998 | 05 | 1998 | INITIATE A PROGRAM TO ACQUIRE ISO CERTIFICATION | $198,225 | $250,000 | Not Implemented |
TN0645 # 12 Y:1998 | 12 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $6,310 | $1,120 | Not Implemented |
TN0645 # 03 Y:1998 | 03 | 1998 | REDUCE SOLUTION DRAG-OUT TO PREVENT SOLUTION LOSS | $237,600 | $153,485 | Not Implemented |
TN0645 # 10 Y:1998 | 10 | 1998 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $9,390 | $8,000 | Implemented |
TN0645 # 09 Y:1998 | 09 | 1998 | INSTALL SET-BACK TIMERS | $15,755 | $1,555 | Not Implemented |
TN0646 # 03 Y:1998 | 03 | 1998 | ADD AREA LIGHTING SWITCHES | $8,900 | $13,600 | Implemented |
TN0646 # 02 Y:1998 | 02 | 1998 | DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | $28,800 | $21,900 | Implemented |
TN0646 # 06 Y:1998 | 06 | 1998 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,600 | $0 | Not Implemented |
TN0646 # 05 Y:1998 | 05 | 1998 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $2,880 | $0 | Implemented |
TN0646 # 04 Y:1998 | 04 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,325 | $5,000 | Implemented |
TN0646 # 01 Y:1998 | 01 | 1998 | REPROCESS SPENT OILS ON SITE FOR RE-USE | $603,410 | $51,350 | Implemented |
TN0644 # 05 Y:1998 | 05 | 1998 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $7,575 | $8,575 | Not Implemented |
TN0644 # 02 Y:1998 | 02 | 1998 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $32,370 | $50,000 | Implemented |
TN0644 # 03 Y:1998 | 03 | 1998 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $17,850 | $32,200 | Implemented |
TN0644 # 06 Y:1998 | 06 | 1998 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,180 | $2,030 | Implemented |
TN0644 # 04 Y:1998 | 04 | 1998 | OPTIMIZE PLANT POWER FACTOR | $11,910 | $1,440 | Not Implemented |
TN0644 # 01 Y:1998 | 01 | 1998 | AVOID CONTAMINATION OF END PIECES AND REUSE AS FEED STOCK | $363,750 | $20,000 | Not Implemented |