Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
283
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TR0006 # 05 Y:2017 | 05 | 2017 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $4,005 | $208 | n/a |
TR0006 # 06 Y:2017 | 06 | 2017 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $117,470 | $11,908 | n/a |
TR0006 # 07 Y:2017 | 07 | 2017 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $11,119 | $3,360 | n/a |
TR0006 # 08 Y:2017 | 08 | 2017 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $23,655 | $0 | n/a |
TR0003 # 01 Y:2017 | 01 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $41,044 | $64,592 | Implemented |
TR0003 # 02 Y:2017 | 02 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $32,843 | $2,000 | Implemented |
TR0003 # 03 Y:2017 | 03 | 2017 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,334 | $14,764 | Not Implemented |
TR0003 # 04 Y:2017 | 04 | 2017 | APPLY FOR INVESTMENT INCENTIVES | $74,012 | $15,000 | Implemented |
TR0003 # 05 Y:2017 | 05 | 2017 | MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT | $24,242 | $38,964 | Implemented |
TR0003 # 06 Y:2017 | 06 | 2017 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $14,265 | $449 | Not Implemented |
TR0003 # 07 Y:2017 | 07 | 2017 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $10,954 | $10,000 | Implemented |
TR0004 # 01 Y:2017 | 01 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $666 | $1,325 | Implemented |
TR0004 # 02 Y:2017 | 02 | 2017 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $4,912 | $0 | Implemented |
TR0004 # 03 Y:2017 | 03 | 2017 | INSTALL REPLACEMENT DOORS | $2,305 | $10,000 | Implemented |
TR0004 # 04 Y:2017 | 04 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $273 | $0 | Implemented |
TR0004 # 05 Y:2017 | 05 | 2017 | OPTIMIZE PLANT POWER FACTOR | $12,722 | $56,000 | Implemented |
TR0004 # 06 Y:2017 | 06 | 2017 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $8,148 | $29,271 | Not Implemented |
TR0004 # 07 Y:2017 | 07 | 2017 | UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS | $27,235 | $100,864 | Not Implemented |
TR0004 # 08 Y:2017 | 08 | 2017 | USE OTHER METHODS FOR NEUTRALIZATION | $258,000 | $292,000 | Not Implemented |
TR0002 # 01 Y:2017 | 01 | 2017 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $30,725 | $22,000 | Implemented |
TR0002 # 02 Y:2017 | 02 | 2017 | USE OPTIMUM THICKNESS INSULATION | $6,968 | $500 | Implemented |
TR0002 # 03 Y:2017 | 03 | 2017 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $9,895 | $10,000 | Not Implemented |
TR0002 # 04 Y:2017 | 04 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $187 | $55 | Implemented |
TR0002 # 05 Y:2017 | 05 | 2017 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,329 | $60 | Implemented |
TR0002 # 06 Y:2017 | 06 | 2017 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,204 | $0 | Implemented |