Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
20
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0257 # 05 Y:2021 | 05 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,573 | $3,100 | Implemented |
TT0257 # 04 Y:2021 | 04 | 2021 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,957 | $12,180 | Not Implemented |
TT0257 # 03 Y:2021 | 03 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,982 | $7,100 | Not Implemented |
TT0257 # 02 Y:2021 | 02 | 2021 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $6,293 | $0 | Implemented |
TT0257 # 01 Y:2021 | 01 | 2021 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $185,939 | $360 | Implemented |
TT0255 # 04 Y:2021 | 04 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,140 | $7,200 | Implemented |
TT0255 # 03 Y:2021 | 03 | 2021 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $20,336 | $24,200 | Implemented |
TT0255 # 02 Y:2021 | 02 | 2021 | RECOVER WASTE HEAT FROM EQUIPMENT | $32,997 | $1,640 | Not Implemented |
TT0255 # 01 Y:2021 | 01 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $43,816 | $1,640 | Implemented |
TT0168 # 04 Y:2016 | 04 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,425 | $3,475 | Implemented |
TT0168 # 03 Y:2016 | 03 | 2016 | INSULATE BARE EQUIPMENT | $3,474 | $6,739 | Not Implemented |
TT0168 # 02 Y:2016 | 02 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $10,532 | $100 | Not Implemented |
TT0168 # 01 Y:2016 | 01 | 2016 | OPTIMIZE PLANT POWER FACTOR | $10,893 | $19,250 | Not Implemented |
TT0163 # 01 Y:2015 | 01 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,742 | $5,000 | Not Implemented |
TT0163 # 07 Y:2015 | 07 | 2015 | TURN OFF EQUIPMENT WHEN NOT IN USE | $423 | $1,500 | Implemented |
TT0163 # 06 Y:2015 | 06 | 2015 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $1,532 | $3,013 | Implemented |
TT0163 # 05 Y:2015 | 05 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,611 | $3,000 | Implemented |
TT0163 # 04 Y:2015 | 04 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,251 | $75 | Implemented |
TT0163 # 03 Y:2015 | 03 | 2015 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,380 | $1,075 | Implemented |
TT0163 # 02 Y:2015 | 02 | 2015 | INSTALL OCCUPANCY SENSORS | $4,100 | $4,110 | Implemented |