Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
52
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0314 # 08 Y:2024 | 08 | 2024 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $1,111 | $4,500 | n/a |
TT0314 # 01 Y:2024 | 01 | 2024 | UPGRADE OBSOLETE EQUIPMENT | $51,299 | $312,500 | n/a |
TT0314 # 02 Y:2024 | 02 | 2024 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $36,167 | $16,000 | n/a |
TT0314 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,281 | $1,500 | n/a |
TT0314 # 04 Y:2024 | 04 | 2024 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $8,319 | $9,842 | n/a |
TT0314 # 05 Y:2024 | 05 | 2024 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $4,118 | $21,260 | n/a |
TT0314 # 06 Y:2024 | 06 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,036 | $8,059 | n/a |
TT0314 # 07 Y:2024 | 07 | 2024 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,112 | $0 | n/a |
TT0293 # 08 Y:2023 | 08 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $736 | $170 | Implemented |
TT0293 # 02 Y:2023 | 02 | 2023 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $10,120 | $0 | Implemented |
TT0293 # 03 Y:2023 | 03 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $7,910 | $600 | Implemented |
TT0293 # 04 Y:2023 | 04 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $6,615 | $31,320 | Implemented |
TT0293 # 05 Y:2023 | 05 | 2023 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $3,025 | $10,040 | Not Implemented |
TT0293 # 06 Y:2023 | 06 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,199 | $0 | Implemented |
TT0293 # 07 Y:2023 | 07 | 2023 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $923 | $1,600 | Implemented |
TT0293 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $20,707 | $1,500 | Implemented |
TT0293 # 09 Y:2023 | 09 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $630 | $2,000 | Implemented |
TT0278 # 07 Y:2022 | 07 | 2022 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $3,425 | $0 | Implemented |
TT0278 # 01 Y:2022 | 01 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $24,020 | $107,478 | Implemented |
TT0278 # 02 Y:2022 | 02 | 2022 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $14,885 | $400 | Not Implemented |
TT0278 # 06 Y:2022 | 06 | 2022 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,143 | $0 | Not Implemented |
TT0278 # 08 Y:2022 | 08 | 2022 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $2,362 | $2,736 | Implemented |
TT0278 # 04 Y:2022 | 04 | 2022 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $5,912 | $18,000 | Implemented |
TT0278 # 05 Y:2022 | 05 | 2022 | INSTALL TIMERS AND/OR THERMOSTATS | $4,507 | $150 | Not Implemented |
TT0278 # 03 Y:2022 | 03 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,152 | $1,500 | Implemented |