Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
471
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UC2511 # 08 Y:2025 | 08 | 2025 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $6,726 | $75 | n/a |
UC2511 # 07 Y:2025 | 07 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $225,469 | $2,423,010 | n/a |
UC2511 # 04 Y:2025 | 04 | 2025 | USE PHOTOCELL CONTROLS | $6,789 | $14,000 | n/a |
UC2511 # 02 Y:2025 | 02 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,290 | $2,200 | n/a |
UC2511 # 01 Y:2025 | 01 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,109 | $1,474 | n/a |
UC2511 # 06 Y:2025 | 06 | 2025 | INSULATE BARE EQUIPMENT | $3,267 | $2,180 | n/a |
UC2511 # 03 Y:2025 | 03 | 2025 | INSTALL OCCUPANCY SENSORS | $6,520 | $10,625 | n/a |
UC2511 # 09 Y:2025 | 09 | 2025 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $116,730 | $360,000 | n/a |
UC2511 # 05 Y:2025 | 05 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $22,999 | $8,485 | n/a |
UC2510 # 04 Y:2024 | 04 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $273 | $113 | n/a |
UC2510 # 01 Y:2024 | 01 | 2024 | PAY UTILITY BILLS ON TIME | $984 | $0 | n/a |
UC2510 # 02 Y:2024 | 02 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $26,200 | $343,027 | n/a |
UC2510 # 03 Y:2024 | 03 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,144 | $1,950 | n/a |
UC2510 # 05 Y:2024 | 05 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $7,585 | $50 | n/a |
UC2510 # 06 Y:2024 | 06 | 2024 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $8,976 | $24,000 | n/a |
UC2509 # 09 Y:2024 | 09 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $13,478 | $50 | n/a |
UC2509 # 03 Y:2024 | 03 | 2024 | OPTIMIZE PLANT POWER FACTOR | $19,546 | $32,370 | n/a |
UC2509 # 08 Y:2024 | 08 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $29,692 | $9,100 | n/a |
UC2509 # 01 Y:2024 | 01 | 2024 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $28,237 | $0 | n/a |
UC2509 # 05 Y:2024 | 05 | 2024 | REPLACE BOILER | $42,258 | $132,297 | n/a |
UC2509 # 02 Y:2024 | 02 | 2024 | PAY UTILITY BILLS ON TIME | $114 | $0 | n/a |
UC2509 # 06 Y:2024 | 06 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,269 | $1,190 | n/a |
UC2509 # 04 Y:2024 | 04 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,936 | $100 | n/a |
UC2509 # 07 Y:2024 | 07 | 2024 | INSULATE BARE EQUIPMENT | $8,347 | $2,798 | n/a |
UC2508 # 04 Y:2024 | 04 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,573 | $150 | n/a |