Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
35
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UC2413 # 07 Y:2024 | 07 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $4,645 | $32,845 | n/a |
UC2413 # 06 Y:2024 | 06 | 2024 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $4,482 | $16,784 | n/a |
UC2413 # 05 Y:2024 | 05 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $1,166 | $2,183 | n/a |
UC2413 # 04 Y:2024 | 04 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $972 | $75 | n/a |
UC2413 # 03 Y:2024 | 03 | 2024 | USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES | $1,916 | $36,122 | n/a |
UC2413 # 02 Y:2024 | 02 | 2024 | CHECK FOR ACCURACY OF UTILITY / POWER METERS | $614 | $0 | n/a |
UC2413 # 01 Y:2024 | 01 | 2024 | PAY UTILITY BILLS ON TIME | $829 | $0 | n/a |
UC2313 # 01 Y:2023 | 01 | 2023 | PAY UTILITY BILLS ON TIME | $275 | $0 | n/a |
UC2313 # 02 Y:2023 | 02 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,527 | $1,500 | n/a |
UC2313 # 03 Y:2023 | 03 | 2023 | INSULATE BARE EQUIPMENT | $1,066 | $3,500 | n/a |
UC2313 # 04 Y:2023 | 04 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $732 | $428 | n/a |
UC2313 # 05 Y:2023 | 05 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $873 | $1,300 | n/a |
UC2313 # 06 Y:2023 | 06 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $251 | $50 | n/a |
UC2313 # 07 Y:2023 | 07 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,805 | $75 | n/a |
UC2313 # 08 Y:2023 | 08 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,884 | $16,157 | n/a |
UC2313 # 09 Y:2023 | 09 | 2023 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $4,673 | $19,488 | n/a |
UC2313 # 10 Y:2023 | 10 | 2023 | INSTALL TIMERS AND/OR THERMOSTATS | $615 | $1,053 | n/a |
UC2302 # 09 Y:2023 | 09 | 2023 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $13,123 | $2,864 | Not Implemented |
UC2302 # 08 Y:2023 | 08 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,690 | $2,800 | Not Implemented |
UC2302 # 01 Y:2023 | 01 | 2023 | PAY UTILITY BILLS ON TIME | $19 | $0 | Not Implemented |
UC2302 # 02 Y:2023 | 02 | 2023 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $519 | $0 | Not Implemented |
UC2302 # 03 Y:2023 | 03 | 2023 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $555 | $540 | Not Implemented |
UC2302 # 04 Y:2023 | 04 | 2023 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $836 | $0 | Not Implemented |
UC2302 # 05 Y:2023 | 05 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,546 | $3,714 | Not Implemented |
UC2302 # 06 Y:2023 | 06 | 2023 | INSTALL OCCUPANCY SENSORS | $136 | $461 | Not Implemented |