IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

446

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0710 # 06 Y:2005 06 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,911 $500 Not Implemented
UD0710 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,172 $2,964 Implemented
UD0710 # 08 Y:2005 08 2005 CHECK FOR ACCURACY OF UTILITY / POWER METERS $717 $0 Implemented
UD0699 # 01 Y:2004 01 2004 $96,000 $204,300 Not Implemented
UD0699 # 02 Y:2004 02 2004 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $85,223 $13,240 Not Implemented
UD0699 # 03 Y:2004 03 2004 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $297,217 $0 Implemented
UD0699 # 04 Y:2004 04 2004 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $18,114 $0 Not Implemented
UD0699 # 05 Y:2004 05 2004 DISCONNECT BALLASTS $7,031 $377 Implemented
UD0699 # 06 Y:2004 06 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,689 $0 Implemented
UD0699 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,162 $8,406 Implemented
UD0699 # 08 Y:2004 08 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $975 $255 Implemented
UD0699 # 09 Y:2004 09 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $775 $0 Implemented
UD0699 # 10 Y:2004 10 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $276 $890 Not Implemented
UD0684 # 01 Y:2003 01 2003 $34,560 $0 Implemented
UD0684 # 02 Y:2003 02 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $23,504 $37,800 Not Implemented
UD0684 # 03 Y:2003 03 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,995 $29,250 Not Implemented
UD0684 # 04 Y:2003 04 2003 OPTIMIZE PLANT POWER FACTOR $15,725 $6,450 Not Implemented
UD0684 # 05 Y:2003 05 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $8,700 $770 Not Implemented
UD0684 # 06 Y:2003 06 2003 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $4,792 $100 Not Implemented
UD0684 # 07 Y:2003 07 2003 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,780 $0 Not Implemented
UD0684 # 08 Y:2003 08 2003 INSTALL COMMON HEADER ON COMPRESSORS $3,865 $0 Not Implemented
UD0684 # 09 Y:2003 09 2003 INSULATE BARE EQUIPMENT $3,252 $8,000 Not Implemented
UD0684 # 10 Y:2003 10 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,396 $613 Not Implemented
UD0684 # 11 Y:2003 11 2003 METER WASTE WATER $1,513 $2,000 Not Implemented
UD0684 # 12 Y:2003 12 2003 REPROCESS SPENT OILS ON SITE FOR RE-USE $3,323 $3,503 Not Implemented