IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,293

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0633 # 03 Y:2001 03 2001 INSULATE BARE EQUIPMENT $10,072 $1,560 Not Implemented
UD0633 # 04 Y:2001 04 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,223 $4,000 Not Implemented
UD0633 # 05 Y:2001 05 2001 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $4,373 $600 Implemented
UD0633 # 06 Y:2001 06 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,155 $5,550 Not Implemented
UD0633 # 07 Y:2001 07 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,150 $1,750 Implemented
UD0633 # 08 Y:2001 08 2001 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,374 $0 Implemented
UD0633 # 09 Y:2001 09 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,094 $180 Not Implemented
UD0632 # 01 Y:2001 01 2001 OPTIMIZE PLANT POWER FACTOR $94,812 $8,000 Implemented
UD0632 # 02 Y:2001 02 2001 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $33,500 $6,000 Not Implemented
UD0632 # 03 Y:2001 03 2001 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $15,075 $0 Not Implemented
UD0632 # 04 Y:2001 04 2001 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $9,915 $0 Implemented
UD0632 # 05 Y:2001 05 2001 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $5,264 $0 Implemented
UD0632 # 06 Y:2001 06 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,400 $1,846 Not Implemented
UD0632 # 07 Y:2001 07 2001 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,355 $0 Not Implemented
UD0632 # 08 Y:2001 08 2001 INSULATE BARE EQUIPMENT $315 $435 Not Implemented
UD0632 # 09 Y:2001 09 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $307 $12 Not Implemented
UD0632 # 10 Y:2001 10 2001 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $207 $300 Not Implemented
UD0631 # 01 Y:2001 01 2001 INSTALL EQUIPMENT TO MOVE PRODUCT $324,000 $1,600,000 Implemented
UD0631 # 02 Y:2001 02 2001 DEVELOP STANDARD OPERATING PROCEDURES $708,750 $350,000 Implemented
UD0631 # 03 Y:2001 03 2001 DEVELOP STANDARD OPERATING PROCEDURES $162,000 $48,000 Implemented
UD0631 # 04 Y:2001 04 2001 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $19,834 $12,680 Not Implemented
UD0631 # 05 Y:2001 05 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,067 $7,000 Not Implemented
UD0631 # 06 Y:2001 06 2001 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $9,670 $3,680 Implemented
UD0631 # 07 Y:2001 07 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,361 $588 Not Implemented
UD0631 # 08 Y:2001 08 2001 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $2,800 $960 Implemented